12.03.2014 Views

Volume-IF - JantERmantER

Volume-IF - JantERmantER

Volume-IF - JantERmantER

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DCPL-K4A02<br />

VOLUME : II-D/2<br />

SECTION-X<br />

TECHNICAL SPEC<strong>IF</strong>ICATION<br />

FOR<br />

FLOOR FINISHES AND ALLIED WORKS<br />

1.0.0 SCOPE<br />

This specification covers furnishing, installation, finishing, curing, testing,<br />

protection, maintenance till handing over various types of floor finishes and<br />

allied items of work as listed below :<br />

a) In Situ Finishes<br />

i) Integral finish to concrete base<br />

ii)<br />

iii)<br />

iv)<br />

Red Oxide of Iron finish<br />

Terrazzo finish<br />

Granolithic finish<br />

v) Patent Stone<br />

vi)<br />

vii)<br />

viii)<br />

Metallic Hardener like "Ironite" finish<br />

Mastic Asphalt finish<br />

Chemical Resistant finish<br />

b) Tiled Finishes<br />

i) Terrazzo tile<br />

ii)<br />

iii)<br />

iv)<br />

Chequered tile<br />

Glazed tile<br />

Tesse rae (Mosaic etc.)<br />

v) Chemical Resistant<br />

vi)<br />

vii)<br />

Rubber, Vinyl etc.<br />

Stone Slab<br />

(PCA.775.S034sc10) V.II-D2/S-X : 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!