TITLE:<br />

SCOPE OF WORK<br />

SPEC<strong>IF</strong>ICATION NO. PE-TS-360-620-C001<br />

VOLUME - II B<br />

SECTION - A<br />

REV.NO. 0 DATE 18.09.2010<br />

SHEET<br />

OF<br />

1.1.3 The scope unde r t his spe cification covers t he c onstruction of Single flue<br />

Reinforced Concrete Chimney including providing all labour,<br />

supervision, materials, scaffolding, power, fuel, construction equipments, tools<br />

and plants, supplies, transportation, storage, insurance and all incidental items<br />

not he rein s pecifically m entioned but r easonably i mplied or w hich m ay be<br />

found necessary for successful completion of the work including c ontractor's,<br />

and where necessary manufacturer's expert supervision in strict compliance with<br />

the requirements of this specification and approved construction drawings. The<br />

tendered amount shall be for the chimney to be completed in all respect as per<br />

this specification for the purpose required.<br />

1.1.4 The suc cessful t enderer sha ll ha ve t o prepare ba r be nding schedule & s chedule of<br />

embedments and get the same approved by t he Engineer. T he detailed fabrication<br />

drawings for doors, flue ducts, ladders, M.S. staircases, hand rails and other fixtures<br />

shall also be prepared by the successful tenderer and got approved from the Engineer<br />

before undertaking the actual fabrication or erection of construction.<br />

1.1.5 The contractor shall prepare, at his own cost, the detailed working drawings showing<br />

all details of the formwork staging (adequacy to be supported by design calculations)<br />

and other arrangements for the concreting work and submit six copies of the same for<br />

the a pproval of t he E ngineer-in-Charge / consultants a nd onl y on t he receipt of the<br />

approval of the consultants the work shall be taken up.<br />

1.1.6 The contractor shall prepare, at his own cost, the detailed working drawings showing<br />

all Electrical details and Elevator details.<br />

2.0.0 TENDER DRAWINGS<br />

2.1.1 The f ollowing dr awing w hich f orms pa rt of T ender D ocuments are indicative and<br />

give ove rall di mensions, a nd s ome ot her typical de tails of t he w ork r equired t o be<br />

done under this contract. The accessories shown in the drawings are also indicative :<br />

S. NO. DRG. NO. TITLE<br />

1. PE-DG-360-620-C001 GENERAL ARRANGE MENT OF<br />

CHIMNEY.<br />

2.1.2 The drawings and specifications furnished are to be considered as explanatory of each<br />

other. S hould anything a ppear in one drawing that is not described in the other, no<br />

advantage s hall be t aken of s uch om ission. S hould a ny di screpancies, how ever,<br />

appear, or should any misunderstanding of drawings or as to the dimensions or quality<br />

of the materials or the due a nd i mproper e xecution of t he w orks or a s t o t he<br />

measurements or quality or valuation of the works executed under this contract or as