VOLUME-<strong>IF</strong><br />

(SER)<br />

TENDER NO – PSER:SCT:DPL-C1154:10<br />

TECHNICAL CONDITIONS OF CONTRACT, SCOPE ETC<br />

(SERVICE)<br />

PAGE 4 OF 35<br />

would be allowed in this regard. BHEL reserve the right not to recognize any / all<br />

deviations submitted after opening of the bid.<br />

5.0 DEWATERING<br />

The contractor shall ensure at all times that his work area & approach/ access<br />

roads are free from accumulation of water, so that the materials are safe and the<br />

erection/ progress schedule are not affected. No separate claim in this regard shall<br />

be admitted by BHEL. No separate payments for dewatering of subsoil, surface<br />

water or catchments water, if required, at any time during execution of the work<br />

including monsoon period shall be considered by BHEL.<br />

6.0 LAND<br />

6.1 Availability of land within plant boundary is very limited and the contractor has to<br />

plan and use the existing land considering the use of land by other<br />

mechanical/electrical contractors and the storage of plant machineries and<br />

materials. The existing land shall be shared by all erections agencies. The same<br />

will be reviewed by BHEL and allotted to the extent available/ considered<br />

necessary, depending upon the area availability. Contractor shall develop these<br />

areas (including work areas as provided by BHEL/ customer) including grass/tree<br />

cutting, leveling, grading etc. Material storage area, if more than the space allotted<br />

to the bidder, shall have to be arranged by the bidder locally as a temporary<br />

arrangement outside the project.<br />

6.2 No land will be provided for labour colony inside the project premises to the<br />

contractor to construct labour colony/ hutment. The contractor will have to make<br />

temporary arrangement (at his own cost) outside the project premises the same in<br />

consultation with customer/ BHEL.<br />

6.3 The contractor will be responsible for handing back all lands, as handed over to<br />

him.<br />

6.4 Area for fabrication, batching plant and storage area for BHEL’s material shall be<br />

provided as per availability free of cost as per enclosed Plot Plan.<br />

7.0 WATER<br />

7.1 BHEL will provide water connection at one point free of cost for construction as<br />

well as drinking water. For further distribution of pipeline net work up to chimney<br />

work spot are to be carried out by the bidder as per requirement at their own cost.<br />

Contractor will submit enabling work plan showing batching plant, civil laboratories,<br />

their own offices, temporary cement store (water tight) of 200 MT capacity, other<br />

strores etc.and construct at their own cost.<br />

7.2 Distribution network for construction and drinking water system within chimney area<br />

shall be done by the bidder at his own cost.<br />

7.3 The availability of water (construction as well as drinking) in customer project is<br />

limited. The contractor shall ensure that no water is wasted. In this regard the<br />

contractor shall take all necessary measure towards preservation of water.<br />

7.4 BHEL shall not be responsible for any inconvenience or delay caused due to any<br />

interruption of water supply and the contractor shall claim no compensation for<br />

delay in work for such interruption. Contractor may make standby arrangement for<br />

water for which no separate payment shall be made by BHEL.<br />

8.0 ELECTRICITY<br />

8.1 BHEL will provide construction power point on free of charge basis at LT voltage<br />

level (3-Ph., 415-V) at around 200M from chimney area. Further distribution<br />

(including laying of cables/ installation DBs and maintenance of the same) beyond<br />

this point to be arranged by the contractor at his own cost. If any other voltage level<br />

(other than normally available) is required, the same shall be arranged by the<br />

contractor from power supply as above. Contractor will have to provide at his own<br />

cost necessary calibrated energy meters (tamper proof, suitably housed in a<br />

weather proof box with lock & key arrangement) at point of power supply along with<br />

calibration certificate from authorized/ accredited agency for working out the power<br />

consumption. In case of recalibration required for any reason the necessary<br />

charges including replacement by calibrated meters is to be borne by contractor.