DCPL-K4A02<br />

TABLE - IV<br />

SCHEDULE OF REMOVAL OF FORM<br />

________________________________________________________________________<br />

Ordinary Portland<br />

Rapid Hardening Portland<br />

Cement Concrete<br />

Cement Concrete<br />

________________________________________________________________________<br />

Part of Temperature Deg.C Temperature Deg.C<br />

Structure<br />

________________________________________________________________________<br />

Above 40 Deg.- 20 Deg.-Below Above 40 Deg.- 20 Deg.- Below<br />

40 Deg.C 20 Deg. 5 Deg. 5 Deg. 40 Deg. 20 Deg. 5 Deg. 5 Deg.<br />

________________________________________________________________________<br />

Days Days Days Days<br />

Days Days Days Days<br />

________________________________________________________________________<br />

a) Columns 2 1 1 Do not 1 1 1 Do not<br />

& Walls remove remove<br />

forms until<br />

forms<br />

b) Beam sides 3 2 3 site cured 2 1 1 until<br />

test speci-<br />

site<br />

c) Slabs, 10 7 8 men develop 7 4 5 cured<br />

125 mm at least test<br />

50% of the specimd)<br />

Slabs over specified en dev-<br />

125 mm 28 days elop at<br />

thick and strength least<br />

soffit of 18 14 16 12 8 9 50% of<br />

minor beams<br />

the specified<br />

28<br />

e) Soffit of 24 21 22 14 10 12 days<br />

main beams<br />

strength<br />

________________________________________________________________________<br />

Wherever exposed surfaces of concrete can be effectively sealed to prevent loss of<br />

water, the periods specified for temperature above 40 Deg.C can be reduced to those of<br />

the temperature range of 20 Deg.C to 40 Deg.C subject to approval of the Engineer.<br />

Construction joints in beams, if required to be provided, will be located within the middle<br />

third of span according to clause 3.13.1(b) of this specification. In such cases,<br />

however, entire span of beam shall have to be kept supported by formwork till its removal<br />

for the portion of beam, cast at a later date, is due and so approved by the Engineer.<br />

If any type of cement other than ordinary portland cement and Rapid<br />

hardening portland cement is used the time of removal or forms shall be<br />

revised as approved by the Engineer such that the strength of this cement<br />

(PCA.774.S034sca3) V.II-D2/S-III : 32