DCPL-K4A02<br />

VOLUME: II-D/2<br />

SECTION-IV<br />

TECHNICAL SPEC<strong>IF</strong>ICATION<br />

FOR<br />

FABRICATION OF STRUCTURAL STEELWORK<br />

1.00 SCOPE<br />

2.00 GENERAL<br />

This specification covers supply of all raw steel materials, fabrication, testing,<br />

painting and delivery to site of structural steelwork including supply of all<br />

consumable stores and bolts, nuts, washers, electrodes and other materials<br />

required for fabrication and field connections of all structural steelwork in<br />

general covered under the scope of the contract. However, for any<br />

special structures such as rail & road bridges, steel chimney, tanks,<br />

transmission towers, furnace structures, etc., the relevant Indian Standard<br />

or IRC specification and Codes of Practices shall be given due<br />

consideration over & above this specification.<br />

2.1.0 Work to be provided for by the Contractor<br />

The work to be provided for by the Contractor, unless otherwise<br />

specified elsewhere in the contract, shall include, but not be limited to the<br />

following :<br />

a) Preparation of complete detailed fabrication drawings and erection<br />

marking drawings required for all the structures covered under the<br />

scope of the contract based on contractor’s design drawings<br />

approved by the Owner / Consultants.<br />

b) To submit revised design with calculations and detailed fabrication<br />

drawings in case any substitution of the designed sections are to be<br />

made.<br />

c) To submit design calculations for joints and connections developed<br />

by the contractor along with detailed fabrication drawings.<br />

d) Furnish all materials, labour, tools and plant and all consumables<br />

required for fabrication and supply, all necessary bolts, nuts, washers,<br />

tie rods and welding electrodes for field connections. The field<br />

connection materials supplied by the contractor shall be in<br />

adequate quantity to avoid delay in erection.<br />

e) Furnish shop painting of all fabricated steelwork as per requirements<br />

of this Specification.<br />

f) Suitably mark, bundle and pack for transport all fabricated<br />

materials.<br />