DCPL-K4A02<br />

paint shall, after fabrication, be cleaned of oil or grease by solvent cleaners<br />

and be cleaned of dirt and other foreign material by through sweeping with a<br />

fibre brush.<br />

After completion of the precleaning, the metal surface shall immediately<br />

painted with red oxide zinc chromate primer conforming to IS : 2074.<br />

In highly corrosive environment, all steelwork shall be given a coat of shop<br />

paint, applied thoroughly and evenly to dry surfaces which have been<br />

cleaned by sand blasting to SA 2/1/2 grade minimum. The shop paint shall<br />

be epoxy rasin based zinc rich primer such as Blast Steel EZ1 of Shalimer<br />

Paint Limited.<br />

3.13.2 Inaccessible parts<br />

Surfaces not in contact, but inaccessible after assembly, shall receive two<br />

coats of shop paint, positively of different colours to prove application of two<br />

coats before assembly. This does not apply to the interior of sealed hollow<br />

sections.<br />

3.13.3 Contact surfaces<br />

Contact surface shall be cleaned in accordance with Sub-clause 3.13.1<br />

before assembly.<br />

3.13.4 Finished surfaces<br />

Machine finished surfaces shall be protected against corrosion by a rust<br />

inhibiting coating that can be easily removed prior to erection or which has<br />

characteristics that make removal unnecessary prior to erection.<br />

3.13.5 Surfaces adjacent to field welds<br />

3.14.0 Galvanizing<br />

3.14.1 General<br />

Unless otherwise provided for, surfaces within 50 mm of any field weld<br />

location shall be free of materials that would prevent proper welding or<br />

produce objectionable fumes while welding is being done.<br />

Structural steelwork for switchyard or other structures as may be specified in<br />

the Contract shall be hot dip galvanized in accordance with the American<br />

Society for Testing and Materials Specification ASTM-A 123 or IS : 2629 -<br />

Recommended practice for Hot-Dip Galvanising of Iron and steel. Where<br />

the steel structures are required to be galvanized the field connection<br />

materials like bolts, nuts and washers shall also be galvanized.<br />

3.14.2 Surface Preparation<br />

(PCA.774.S034sca4) V.II-D2/S-IV : 17