PEM-6666-0<br />

TITLE SPEC<strong>IF</strong>ICATION NO. PE-TS-360-620-C001<br />

TECHNICAL SPEC<strong>IF</strong>ICATION FOR<br />

VOLUME: IIB<br />

STACK ELEVATOR<br />

SECTION C<br />

REV 0 DATE<br />

SHEET<br />

OF<br />

i) Train cable in place and cut squarely to required length, Avoid sharp bends.<br />

ii)<br />

iii)<br />

iv)<br />

Remove necessary amount of cable jacket and insulation without damage to the<br />

conductor.<br />

Install terminals or connectors as required, ensuring a firm metal-to-metal contact.<br />

If the connection requires insulation, (i.e. cable connects to insulated conductors),<br />

apply three half-lapped layers of insulating tape over the joint, extending to two cable<br />

diameters over the cable jacket and a similar distance over any other insulation or<br />

connection requiring insulation.<br />

6.03.09 Earthing<br />

Insulated conductors shall be tested after installation with a 1000 volt megger or an eqivalent<br />

testing device and shall indicate approximately infinite resistance between conductors of the<br />

same circuit and between conductors and ground. Equipment and labour required for testing<br />

shall be provided by the Contractor. Any circuit failing to test satisfactorily shall be replaced<br />

or repaired and retested as directly by the Engineer-in-Charge.<br />

a) General<br />

Earthing system furnished and installed and include a complete earthing system for the<br />

elevator. Earthing equipment and materials shall be furnished and installed in accordance with the<br />

reference codes and standards these specification and the contractor’s shop drawings as reviewed and<br />

accepted by the Engineer-in-Charge.<br />

b) Materials<br />

The earthing of all electrical items being supplied by the Bidder shall be in his scope. For earthing the<br />

various equipment, conductor sizes shall be as listed below:<br />

i) MCCs Motor above 90 KW : 50 x 6 Sq.mm G.I. flat<br />

ii)<br />

Motors above 30 KW, upto<br />

75 KW and lighting panel/<br />

control panels/auxiliary panels : 25 x 6 Sq. mm G.I. flat<br />

iii) Motor above 5 KW upto 30 KW : 25 x 3 mm G.I. flat<br />

iii)<br />

Motors upto 5 KW and misc.<br />

Small item like conduits,<br />

Junction boxes etc.<br />

The earthing strip/wire shall be connected to the earthing mat by the Bidder provided in the<br />

chimney area. Clamps and other hardware of iron or steel used with the grounding system<br />

shall be hot-dip galvanized. Bolts, washers and nuts shall be hot-dip galvanized steel.<br />

Installation<br />

Exposed conductors shall be installed inconspicuously in vertical or horizontal positions on<br />

supporting structures. When located on irregular supporting surfaces or equipment, the<br />

conductors shall run parallel or normal to dominant surfaces.<br />

Conductors routed over concrete steel or equipment surfaces shall be kept in close contact<br />

with those surfaces by using fasteners located at intervals not to exceed one (1) metre.