VOLUME-<strong>IF</strong><br />

(SER)<br />

TENDER NO – PSER:SCT:DPL-C1154:10<br />

TECHNICAL CONDITIONS OF CONTRACT, SCOPE ETC<br />

(SERVICE)<br />

PAGE 8 OF 35<br />

13.3 The procedure for source inspection, incoming raw material inspection, verification<br />

of material purchased etc.<br />

13.4 Field quality plan will detail out the quality practices and procedures etc to be<br />

followed by the contractor’s site quality control organization, during various stages<br />

of site activities from receipt of material /equipment at site.<br />

13.5 Bidder to arrange temperature control at around 25˚ C during chimney raft, either<br />

by sprinkling water on course aggregate or by using Ice, including all related<br />

arrangements for providing, storing and mixing Ice with water, cooling of<br />

aggregates etc.<br />

14.0 HSE REQUIREMENTS (HEALTH, SAFETY AND ENVIRONMENT)<br />

14.1 The contractor shall ensure the safety of all workmen, materials and equipment<br />

either belonging to him or to others working at site. He shall observe safety rules<br />

and codes applied by the customer/ BHEL at site without exception.<br />

14.2 Passenger lift should have safety cage with multiple rope, i.e. with safety rope &<br />

limit switch.<br />

14.3 Safety nets with hand railings must be provided on all both inside & outside hanging<br />

platform of slip-form equipment & hanging platform from brickwork.<br />

14.4 Emergency vehicle must be provided & kept separately as stand-by.<br />

14.5 T&P used by contractor should be tested quality bearing ISI marks. Necessary test<br />

certificates to be produced by the contractor for all the T&P received by him at site<br />

for acceptance by BHEL Engineer. BHEL will reject any T&P without IS test<br />

certificate and the same cannot be utilized on job.<br />

14.6 Only trained and experienced personnel to be used on the job. Signalling for rigging<br />

operations must be given by workers who are possessing required skill and<br />

experience in handling materials.<br />

14.7 Non-conformity of safety rules and safety appliances will be viewed seriously and<br />

BHEL has right to impose fines on the contractor on each incident/each nonconformity<br />

as per details given below.<br />

Safety measure<br />

Fine (Rs)<br />

14.7.1 Not wearing safety helmet & safety shoe. Will not be permitted to<br />

enter the plant<br />

14.7.2 Not wearing safety belt. Will not be permitted to<br />

work at heights for erection<br />

job.<br />

14.7.3 Grinding without goggles. 25/workmen<br />

14.7.4 Not using 24V supply for internal work. 500/case<br />

14.7.5 Electrical plugs not used for hand machines. 100/case<br />

14.7.6 Welding cables, electrical wires not insulated with 50/joint<br />

proper/ standard.<br />

14.7.7 Not removing scrap from platform. Actual cost for removal plus<br />

30 %<br />

14.7.8 Gas cutting without taking proper precaution/not 100/case<br />

using sheet below per incidence.<br />

14.7.9 Electrical winches having no guards earthed properly 500/case<br />

etc.<br />

14.7.10 Improper earthing of electrical T&P. 200/ equipment<br />

14.7.11 Not protecting/locating the gas cylinder to avoid 100/cylinder<br />

catching of fire.<br />

14.7.12 Not providing earth leakage circuit breaker as per 1500/point<br />

direction of BHEL.<br />

14.7.13 Not slinging properly 200/case<br />

14.7.14 Using damaged sling 200/case<br />

14.7.15 Lifting cylinders without cage 500/case<br />

14.7.16 Backfire arrestor 500/case<br />

14.7.17 Life line 500/case<br />

14.7.18 Fall arrestor 500/case