TITLE:<br />

SPEC<strong>IF</strong>ICATION NO. PE-TS-360-620-C001<br />

VOLUME - II B<br />

SPEC<strong>IF</strong>IC TECHNICAL<br />

REQUIREMENTS FOR<br />

SECTION - C SUB SECTION: II<br />

ELECTRICAL WORKS<br />

SHEET 5 OF 6<br />

with cable boxes, double compression nickel-chromium plated brass cable<br />

glands (heavy duty type), solderless tinned copper crimping cable lugs etc.<br />

2.14 The size of two nos. down conductors for earthing are 50 x 6 mm GS flat<br />

extending at different platforms for electrical equipment earthing. These<br />

down conductor are in addition to lightning down conductor.Total four nos.<br />

down conductor shall be provided<br />

2.15 Various drawings, data, calculations, test reports, test certificates, operation<br />

and maintenance manuals etc. as specified shall be furnished after award of<br />

contract for approval of purchaser/customer/consultant.<br />

2.16 Make of equipment/components shall be subject to<br />

purchaser/customer/consultant approval after award of contract without any<br />

commercial or delivery implications to the purchaser.<br />

2.17 Bidder shall quote for mandatory spares for electrical equipment as per<br />

attached list. Bidder may further note that purchaser reserves the right to<br />

delete any item/ all items from the list after award of contract.<br />

2.18 Bidder shall furnish list of recommended spares for 3 years for all electrical<br />

equipments with unit prices.<br />

2.19 Start-up & commissioning spares for electrical equipment shall be supplied<br />

on as required basis and cost for the same shall be included in the main<br />

equipment cost.<br />

2.20 Bidder shall furnish List of Erection & maintenance tools & tackles with the<br />

offer.<br />

2.21 Bidder shall furnish unpriced “Price Schedule” for electrical equipments with<br />

the offer.<br />

2.22 All equipment shall be suitable for the power supply fault levels and other<br />

climatic conditions mentioned in the enclosed project electrical information.<br />

2.23 Bidder shall furnish electrical load requirements for normal 415V AC &<br />

Emergency 415V AC after award of contract.<br />

2.24 The final technical particulars of various electrical equipment/ components/<br />

items shall be subject to purchaser/consultant/customer approval after award<br />

of contract.<br />

2.25 The detailed Schedule of Equipment is enclosed in the form of Electrical<br />

Equipments BOQ.<br />

2.26 Various drawings/ documents for electrical equipments for chimney shall be<br />

prepared by bidder after award of contract for approval of<br />

purchaser/customer/consultant.<br />

REV.NO. 0 DATE: 18.09.2010<br />

3.00 EQUIPMENT & SERVICES TO BE PROVIDED BY PURCHASER FOR<br />

ELECTRICAL & TERMINAL POINTS<br />

3.01 Power cables for incomer to 415 V AC Distribution Board (ACDB) and AC<br />

Emergency Lighting distribution board (ELDB). However, termination of<br />

incomer power cables in ACDB & ELDB shall be carried out by bidder.<br />

ACDB & ELDB shall be located inside the chimney. Bidder to note that the<br />

second incomer to ELDB shall be derived from ACDB by the bidder. Cable<br />

glands and lugs shall be supplied by the bidder.<br />

3.02 Cable trench, cable trays/GI pipes up to the boundary limit of the chimney<br />

i.e. 3M away from outer shell. Bidder shall coordinate with the purchaser for