12.03.2014 Views

Volume-IF - JantERmantER

Volume-IF - JantERmantER

Volume-IF - JantERmantER

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TITLE:<br />

SPEC<strong>IF</strong>IC TECHNICAL<br />

REQUIREMENTS FOR<br />

ELECTRICAL WORKS<br />

SPEC<strong>IF</strong>ICATION NO. PE-TS-360-620-C001<br />

VOLUME - II B<br />

SECTION - C SUB SECTION: II<br />

REV.NO. 0 DATE: 18.09.2010<br />

SHEET 2 OF 6<br />

1.00 ELECTRICAL SYSTEM<br />

1.01 415V, normal and emergency AC power supply for chimney shall be derived<br />

from main plant power supply system. Emergency supply shall feed 20% of<br />

platform lighting, 50% of staircase lighting, aviation obstruction lighting and<br />

elevator load. All other loads shall be connected on normal power supply.<br />

1.02 Ambient temperature for design of all equipment shall be considered as 55<br />

deg. C which is likely to be encountered inside the chimney.<br />

1.03 The distribution boards of chimney shall comprise switch-fuse units of<br />

appropriate ratings. Emergency board shall have two incomers, one from<br />

emergency supply and other from normal AC distribution board itself. Autochangeover<br />

scheme shall be provided in emergency board to enable<br />

changeover to healthy source on failure of any source.<br />

1.04 Dry type isolating transformer of Dyn connection shall be provided in<br />

emergency board to obtain neutral lead, in case 3 phase 3 wire emergency<br />

supply is derived from main plant.<br />

1.05 Various platforms shall be illuminated by 70/150W HPSV well glass lighting<br />

fixtures. Staircase lighting shall be with 70W HPSV well glass fixtures.<br />

Average illuminations level of 150 lux shall be maintained on equipment and<br />

50 lux on platforms/staircases. Lighting system shall be controlled through<br />

MCB provided in lighting panel.<br />

1.06 A lighting panel each shall be located at grade level and at other in between<br />

levels as required. All distribution boards, aviation lighting controls, etc. shall<br />

be located at grade level only. At each platform, 1 No. 63A, 415V welding<br />

receptacle and 1 No. 15A, 240V receptacle shall be provided. Wiring<br />

installation for lighting fixture shall be of PVC insulated copper/aluminum<br />

wires through galvanized steel conduits.<br />

1.07 Aviations obstruction lighting system shall conform to the requirements of the<br />

latest rules and regulations of the International Civil Aviation Organization<br />

(ICAO), National Airports Authority (NAA) and Directorate of Air Routes<br />

and Aerodromes (DARA). The type of aviation obstruction lighting system<br />

shall be of high intensity aviation obstruction lights having an intensity of<br />

4000 to 200000 cd depending upon background illuminance. The aviation<br />

obstruction lighting system shall be of type FTB205 and FTC 110N of Flash<br />

Technology Corporation of USA or equivalent. A minimum of three levels<br />

will be provided with aviation obstruction lights and there will be four lights<br />

per level The obstacle lights shall flash simultaneously at a rate between 40<br />

and 60 per minute. Aviation obstruction lighting shall be provided as per the<br />

approved drawings. Aviation obstruction lighting shall be complete with<br />

lights, photo cell, controller, special cables, etc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!