DCPL-K4A02<br />

g) Excavation, filling and compaction by mechanical plant<br />

h) Dealing with surface water<br />

i) Dewatering<br />

3.2.0 Setting Out<br />

3.3.0 Initial Levels<br />

j) Disposal of materials<br />

k) Safety precautions, fencing and lighting<br />

l) Calculations as appropriate to support work proposal<br />

The Contractor will prepare and submit to the Engineer, detailed drawings<br />

of the excavation and filling work necessary, as proposed to be executed<br />

by him, showing the dimensions as per drawings and specification, adding<br />

his proposals for slopes, approaches, dewatering sumps, berms etc. On<br />

receiving the approval from the Engineer with modifications and corrections if<br />

necessary, the Contractor will set out the work from the control points<br />

furnished by the Engineer and fix permanent points and markers for future<br />

checking. These permanent points and markers will be checked by the<br />

Engineer and certified by him after which the Contractor will proceed with<br />

the work. Engineer shall be provided with necessary men, material and<br />

instruments for such checking. It should be noted that this checking by<br />

the Engineer prior to start of the work will in no way absolve the Contractor of<br />

his responsibility of carrying out the work to true lines, levels and grades as<br />

per drawing and subsequent corrections, if any. In case any errors are<br />

noticed in the Contractor's work at any stage, the same shall be remedied by<br />

the Contractor.<br />

Initial levels either in a definite grid pattern or as directed by the Engineer<br />

will be taken by the Contractor jointly with the Engineer over the original<br />

ground prior to starting actual excavation work and after setting out.<br />

These initial levels will be used for preparing cross-sections for volume<br />

measurement or for cross-checking the depths obtained from tape<br />

measurements. These initial levels and cross-sections shall be jointly<br />

signed by the Contractor and the Engineer before commencement of work.<br />