DCPL-K4A02<br />

Materials or workmanship not in reasonable conformance with the<br />

provisions of this Specification may be rejected at any time during the<br />

progress of the work.<br />

The quality control procedure shall cover but not be limited to the following<br />

items of work :<br />

1) Steel : Quality, manufacturer's test certificates, test reports<br />

of representative samples of materials from<br />

unidentified stocks if permitted to be used.<br />

2) Bolts, Nuts : Manufacturer's certificate, dimension<br />

& Washers checks, material testing.<br />

3) Electrodes : Manufacturer's certificate, thickness and quality of flux<br />

coating.<br />

4) Welders : Qualifying Tests<br />

5) Welding sets : Performance Tests<br />

6) Welds : Inspection, X-ray, Ultrasonic tests<br />

7) Paints : Manufacturer's certificate, physical inspection reports<br />

8) Galvanizing : Tests in accordance with IS : 2633 -<br />

Method for testing uniformity of coating on Zinc<br />

Coated Articles and IS : 4759 - Specification for Hot-<br />

Dip Zinc coatings on Structural Steel and other<br />

allied products.<br />

2.8.0 Standard dimensions, forms and weights<br />

The dimensions, forms, weights and tolerances of all rolled shapes bolts,<br />

nuts, studs, washers etc. and other members used in the fabrication of<br />

any structure shall, wherever applicable, conform to the requirements of<br />

the latest relevant Indian Standards, wherever they exist, or, in the absence<br />

of Indian Standards, to other equivalent standards.<br />

2.9.0 Shop Drawings<br />

The Contractor shall submit to the Engineer the Schedule of Fabrication<br />

and delivery of structural steelwork for approval. He shall start to submit<br />

progressively for approval the shop drawings based on the approved Design<br />

Drawings and before proceeding with the fabrication work, shall get the<br />

said shop drawings approved in accordance with the contract.<br />

(PCA.774.S034sca4) V.II-D2/S-IV : 9