TITLE SPEC<strong>IF</strong>ICATION NO. PES-509-02A<br />

LIGHTNING PROTECTION &EARTHING<br />

OF CHIMNEY<br />

(SUPPLY & INSTALLATION)<br />

VOLUME<br />

II B<br />

SECTION<br />

D<br />

REV NO. 0 DATE 08.02.2002<br />

SHEET 3 OF 4<br />

annular horizontal air term inations. The vertical air term inations shall be electrically<br />

connected (Brazed) to the horizontal air term inations, the vertical term ination of the<br />

flues and those of the Chim ney to the hor izontal term ination of the Chim ney. The<br />

vertical terminations shall be spaced not more than 3m apart from each other.<br />

3.2 The air term inations shall be secured to the top of Chim ney top by an arrangem ent of<br />

substantially strong construction to withstand high wind pressure prevalent in the area<br />

commensurate with the height involved. A ll m aterials for the securing arrangem ent<br />

shall be of the sam e grade as the conductors and must be galvanised. The vertical air<br />

terminals at the top of the shell shall also be secured to the guard ring at the top of the<br />

shell.<br />

3.3 A minimum of two num bers of equally spaced conductors, each consisting of 50x6m m<br />

GI strip, shall be brought down from their connecting points on the annular rings at the<br />

top of the Chim ney/flues. The down-conductors originating at the top of the flues shall<br />

be brought down along the walls of the flues a nd electrically connected (welded) to the<br />

annular ring at the top of the outer sh ell of the Chim ney. The down conductors<br />

(minimum two num bers) from the chim ney top shall be brought down to the bottom of<br />

the Chimney all along the exterior Chimney wall.<br />

3.4 A test link of copper black/phosphor bronze gunm etal bolted to the conductor for the<br />

purpose of isolation & testing shall be provided on each down conductor 1000mm above<br />

ground level.<br />

3.5 Down conductors shall be cleated to the wall at an interval of 1500m m all along the<br />

length of the Chimney.<br />

3.6 Down conductors near ground level shall be protected against m echanical injuries by<br />

means of wood-m oulding or non-m etallic cove r. A rem ovable cover of the sam e<br />

material shall be provided over the test- link for easy access.<br />

3.7 The connection between the downconductor from the test link onwards upto an annular<br />

ring of galvanised steel running around the en tire periphery of the chimney bottom shall<br />

be provided through risers which shall be of 40mm dia MS rods.<br />

3.8 The risers shall be term inated on the annular ring of 40m m dia MS rod running around<br />

the periphery of the chim ney buried 1 m etre deep in the ground and clearing all<br />

foundation by at least 2 metres.<br />

3.9 From the term ination points of the downconductors on to this underground ring, m ild<br />

steel rods shall terminate at test pits complete with test-links and electrodes.<br />

3.10 The test pits at para 3.9 shall in turn be connected to the m ain earthmat of the power<br />

house through 40mm dia MS rod.<br />

3.11 All joints, except for testing purposes, shall be welded type lap joints with an overlap of<br />

100mm. The welding shall be com plete around the joint and not tack welded. Electric<br />

arc welding shall be used for all joints.<br />

3.12 After welding, two coats of anti-corrosive (red-oxide) paint followed by a coat of<br />

bituminous paint shall be applied to each joint.<br />

3.13 The 40m m dia MS rods shall be protected against corrosion by applying a coat of<br />

barium chromate paint and two coats of bitumen below the test link.