12.03.2014 Views

Volume-IF - JantERmantER

Volume-IF - JantERmantER

Volume-IF - JantERmantER

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.5.2 Marking<br />

DCPL-K4A02<br />

the Owner may prescribe or control the sequence of delivery of materials, at<br />

his own discretion.<br />

Each separate piece of fabricated steelwork shall be distinctly marked<br />

on all surfaces before delivery in accordance with the markings shown<br />

on approved erection drawings and shall bear such other marks as will<br />

further facilitate identification and erection.<br />

4.5.3 Packing and Shipping<br />

All projecting plates or edges and all ends of members of joints shall be<br />

stiffened, all straight members and plates, shall be bundled, all screwed<br />

ends and machined surfaces shall be suitably packed and all bolts, nuts,<br />

washers, and small loose parts shall be packed separately in order to<br />

prevent damage or distortion during shipping.<br />

Shipping shall be strictly in accordance with the sequence stipulated in<br />

the agreed programme. Payment may be held up for items sent in advance<br />

of the sequence till they could be erected. The Contractor shall include<br />

and provide for in his rates, the freight and other charges for<br />

despatching the materials to the worksite and also for securely protecting<br />

and packing the materials to avoid loss or damage during transport by rail,<br />

road or water. All packings shall allow for easy removal and checking at<br />

site. Special precautions shall be taken against rusting, corrosion, breakage<br />

or damage otherwise of the materials. All parts shall be adequately braced<br />

to prevent damage in transit.<br />

Each bundle, bale or package delivered under this contract shall be<br />

marked on as many sides as possible and such distinct marking (all previous<br />

irrelevant markings being carefully obliterated) shall show the following : -<br />

a) Name and address of the consignee<br />

b) Name and address of the consignor<br />

c) Gross weight of the package in tonnes and its dimensions<br />

d) Identification marks and/or number of the package<br />

e) Custom registration number, if required<br />

All markings shall be carried out with such materials as would ensure quick<br />

drying and indelibility.<br />

Each component or part or piece of material when shipped, shall be<br />

indelibly marked and/or tagged with reference to assembly drawings and<br />

corresponding piece numbers.<br />

(PCA.774.S034sca4) V.II-D2/S-IV : 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!