DCPL-K4A02<br />

impair the strength of concrete or cause stains or marks on the finished<br />

surface. Where there are chances of these fixtures being embedded, only<br />

mild steel or concrete of adequate strength shall be used.<br />

Alternatively, except in case of water retaining structures through rods<br />

and the tie bolts shall be sleeved with PVC conduits to allow retraction of<br />

the ties on removal of the shutters. Where required, the annulus of the<br />

conduits will be filled with expanding mortar to seal the void. Bolts<br />

passing completely through liquid retaining walls/slabs for the purpose of<br />

securing and aligning the formwork shall not be used.<br />

The formwork shall be such as to ensure a smooth uniform surface free<br />

from honeycombs, air bubbles, bulges, fins and other blemishes. Any<br />

blemish or defect found on the surface of the concrete must be brought to<br />

the notice of the Engineer immediately and rectified as directed by him.<br />

For exposed interior and exterior concrete surfaces of beams, columns and<br />

wall, plywood or other approved form shall be thoroughly cleaned and tied<br />

together with approved corrosion- resistant devices. Rigid care shall be<br />

exercised in ensuring that all column forms are plumb and true and<br />

thoroughly cross braced to keep them so. All floor and beam centering<br />

shall be crowned not less than 8 mm in all directions for every 5 metres<br />

span.Unless specifically described on the drawings or elsewhere to the<br />

contrary, bevelled forms 25 mm by 25 mm shall be fixed in the form-work<br />

at all corners to provide chamfering of the finished concrete edges. The<br />

formwork should lap and be secured sufficiently at the lift joints to prevent<br />

bulges and offsets.<br />

Temporary openings for cleaning, inspection and for pouring concrete shall<br />

be provided at the base of vertical forms and at other places, where they<br />

are necessary and as may be directed by the Engineer. The temporary<br />

openings shall be so formed that they can be conveniently closed when<br />

required, during pouring operations without leaving any mark on the<br />

concrete.<br />

3.20.2 Cleaning and Treatment of Forms<br />

All parts of the forms shall be thoroughly cleaned of old concrete, wood<br />

shavings , saw dust, dirt and dust sticking to them before they are fixed in<br />

position. All rubbish, loose concrete, chippings, shavings, saw dust etc.<br />

shall be scrupulously removed from the interior of the forms before<br />

concrete is poured. Compressed air jet and/or water jet along with wire<br />

brushes, brooms etc. shall be used for cleaning. The inside surface of the<br />

formwork shall be treated with approved non-staining oil based shutter<br />

release agent like "Separol/Sika form oil/ Siparol Concentrate" before it is<br />

placed in position. Care shall be taken that oil or other compound does<br />

not come in contact with reinforcing steel or construction joint surfaces.<br />

(PCA.774.S034sca2) V.II-D2/S-III : 29