OCPL-K9A01<br />

For movement of personnel supervising the work a seperete hoist<br />

must be arranged for.<br />

17. The system being operative round the clock it is obligatory to have<br />

adequate lighting arrangement both on various platform levels as well<br />

as on ground below. Arrangement has to be made for facilitating<br />

continuous upward movement of the entire system alongwith sllpform,<br />

18. Winches for lifting men and material and mixers, if located within<br />

unnsafe area around chimney, should be protected by adequate<br />

shelter from possible damage.<br />

19. Proper tele-communication system has to be established between<br />

the personnel working on top of Chimney and control room below,<br />

20. A small laboratory should be maintained at site for testing different<br />

materials like cement. coarse and fine aggregates, A cube testing ­<br />

machine may also be installed at site for getting quick feed back<br />

results.<br />

Apart -from using ,plumb bobs, level and theodolite Instruments for<br />

survey purpose arrangement should also be kept for lasers,<br />

21. In case of interruption in the course of Slipping of formwork following<br />

measures should be taken :<br />

. a) Provision of a key and additional reinforcement at the Junction<br />

of new and old concrate,<br />

b) Slipforrn system should be brought up freely to have a<br />

minimum overlap of 100 mm or so oyer previously cast<br />

concrete.<br />

c) Washing of old c:oncrate surface with compressed air and<br />

, water jet and thereafter pouring a layer of neat cement grout.<br />

d) Clearing of shuttering panels of loose materials, concrate etc.<br />

by compressed air and· applying a coat of epoxy paint, if felt<br />

necessary' by. Engineer. . _ .<br />

- e) Neatly finishing the interface of old or new 90ncrate as soon as<br />

It comes out of shuller panel.<br />

22, It is preferable to suspend the construction work und~r high wind<br />

condition,<br />

23.'<br />

It is of utmost importance that for effective impiamentatlon of this<br />

system an Engineer fully conversant with Slipform technique with<br />

enough experiern:e In planning and control of formwork should be In<br />

overall command of the site and he should be ably supported by well<br />

trained mid IeVeisupervisory staff, &killed workers and operators.<br />

(PCA.CD-003,S805CSA24,doc.doc) V.U-02lS-XXIV: 22