DCPL-K4A02<br />

Unless specified otherwise, inspection to all work shall be made by the<br />

Engineer or Engineer's representative at the place of manufacture prior to<br />

delivery. The Engineer or his representative shall have free access at all<br />

reasonable times to those parts of the manufacturer's works which are<br />

concerned with the fabrication of the steelwork under this Contract and he<br />

shall be afforded all reasonable facilities for satisfying himself that the<br />

fabrication is being done in accordance with the provisions of this<br />

Specification.<br />

The Contractor shall provide such labour, materials, electricity, fuel, water,<br />

stores, tools and plant, apparatus and instruments as may be required by<br />

the Engineer to carry out inspection and/or tests in accordance with the<br />

Contract.<br />

The Contractor shall guarantee compliance with the<br />

Specification.<br />

provisions of this<br />

4.2.0 Testing and Acceptance Criteria<br />

4.2.1 General<br />

4.2.2 Steel<br />

The Contractor shall carry out sampling and testing in accordance with<br />

the relevant Indian Standards and as supplemented herein for the<br />

following items at his own cost, unless otherwise specified in the Contract.<br />

The Contractor shall get the specimens tested in a laboratory approved by<br />

the Engineer and submit to the Engineer the test results in triplicate<br />

within 3 (three) days after completion of the test.<br />

All steel supplied by the Contractor shall conform to the relevant Indian<br />

Standards. Except otherwise mentioned in the Contract, only tested quality<br />

steel having mill test reports shall be used. In case unidentified steel<br />

materials are permitted to be used by the Engineer, random samples of<br />

materials will be taken from each unidentified lot of 50 M.T. or less of any<br />

particular section for tests to conform to relevant Indian Standards.<br />

All material shall be free from all imperfections, mill scales, slag intrusions,<br />

laminations, pittings, rusts etc. that may impair their strength, durability and<br />

appearance.<br />

4.2.3 Testing Criteria for checking Lamination in raw steel plates<br />

All raw steel plate of thickness more than 20 mm supplied by the<br />

contractor shall be checked against lamination before procurement & prior<br />

(PCA.774.S034sca4) V.II-D2/S-IV : 19