, ( OCPL-K9A01<br />

established to suit the purpose depending on availability of<br />

aggregates.<br />

d) M"IX design also should be so done that II has a slump of 50<br />

mm at the point where concrete is placed under an ambient<br />

temperatura of around 40 Oeg.C. This wlll also keep vibration<br />

by needle vibrators to required minimum. Slump should 'not<br />

drop down to zero In less than 45 minutes. Suitable ratarding<br />

agent and plasticizer of approved manufaCture may be added<br />

in mix to achieve this purpose. These admlxturas to be<br />

properly Identified by praliminary tests both for pedormance<br />

and for compatibility with particular type Qf cement propoSed 1(,<br />

be used.<br />

Additlonal steps Ike spraying of water over tha shutters and<br />

keeping down the temperatura of coarse aggregates by<br />

continuous spraying of water over those may be rasorted 10 kl<br />

ambient temperatura is more than 40 Oeg.C.<br />

,<br />

3.<br />

t.<br />

2. Cere must be taken to pravent twist. which predominantly occur in the<br />

initial stages because of low ,tipping rate, in the horizontal plane of<br />

Slip-form assembly. A thorough check on this aspect must be kept at<br />

every 15 minutes interval. One person should exclusively be assigned<br />

this work together wfth rectifying any defect.<br />

Every endeavour has to be made so as not to occur any tilt in the<br />

shutter assembly. To achieve thls following steps need be1aken :<br />

a) Performance of jacks has to be closely observed and any<br />

defective one needs Immediate replacement. Difference' In<br />

levels of opposite jaclls at any instant of time should not<br />

exceed 5 mm.<br />

(: b) Loading on Stip-form Inlsslyokes has to be fairly equal.<br />

•<br />

c) Sleeve through whlOn jacking rod passes has to be of<br />

sufficient length so' that· later gets an uniform clearance· and<br />

. does not get any chance to bll SJeeveshouldhavea minimum<br />

wan thickness of 3.25 mm and should' bE! such that jacking<br />

#:.:: rod gats a maximum clearance of 1 mm to 1.5 mm alround.<br />

,~"'<br />

(j:<br />

4. For taper walled chimneys ovellapping of shutt!)rs which are kept te<br />

efIact the tapering. needs careful attention otherwise these may be<br />

ruled with concrete slurry.<br />

t<br />

5. . In designing the mix fOllowing aspects should be borne in mind :<br />

t<br />

a) Cement used should have an initial selting time of not less<br />

than 50 minutes and preferably should have a specifIC surface<br />

around 3600 Sq.Cm.per gram.<br />

t:. .;, b) Coarse and fine aggregates should be well graded a<br />

42~,~<br />

(PCA,C0-003.S80SCSA24.dOC.dOC) V.U-02lS-XXIV: 19<br />

t;<br />

327<br />

(;