TECHNICAL SPEC<strong>IF</strong>ICATION FOR<br />

REINFORCED CONCRETE<br />

CHIMNEY<br />

SPEC<strong>IF</strong>ICATION NO. PE-TS-360-620-C001<br />

VOLUME - II B<br />

SECTION - C SUBSECTION : I<br />

REV.NO. 0 DATE 18.09.2010<br />

SHEET<br />

OF<br />

Galvanised mild steel discrete strakes shall be provided over the required length of<br />

the chimney at the t op, i f f ound ne cessary f rom w ind t unnel s tudies f or c himney<br />

model.<br />

2 0 APPROACH TO WORK SITE<br />

The contractor sha ll make his ow n arrangements at his ow n cost f or t he ne cessary<br />

approach r oads f or t ransport of m aterials t o s ite of w ork. N o extra charge will be<br />

paid.<br />

3.0 DAMAGES TO THE OTHER STRUCTURE AND PLANT<br />

The contractor shall be totally held responsible for any loss or damages caused by an<br />

any act of t he c ontractors, l abour or hi s s ub-contractor's l abour i ncluding but not<br />

limited t o c overed/open bl asting t o t he e xisting s tructures and plant or any other<br />

structures or plant that may be under construction/erection by any other agency at this<br />

site during the entire period covered by this contract along with time extension if any.<br />

Any permission given by the Engineer to the contractor to carry out such work, such<br />

as blasting etc. shall not be construed to be waiver of the Contractor's responsibility.<br />

In such cases the amount in respect of loss of damage. shall be considered as final and<br />

binding on the contractor & shall stand recoverable.<br />

4.0 DE-WATERING<br />

No separate pa yments f or de watering of sub -soil or surf ace water if re quired or<br />

removal of slush at any time dur ing c onstruction w ork i ncluding m onsoon pe riods<br />

would be made and the rates quoted by the Tenderers for various items under in Vol.<br />

III are deemed to be inclusive of cost of such dewatering & removal of slush where<br />

necessary.<br />

5.0<br />

FORM WORK<br />

The c himney s hell s hall be c onstructed by us ing s lip f orm technique only. The<br />

contractor s hall be a llowed t o us e f orm w ork a s pe r hi s own design subject to<br />

however that the design shall conform to the most acceptable practice for such type of<br />

work a nd t he r elevant I S s pecification. T he de sign shall also be approved by the<br />

Engineer-in-charge. T he re sponsibility of f orm s triking period shall re st with<br />

contractor subject to however t hat t he sam e sha ll not be l ess t han the minimum<br />

recommended under the relevant IS specification.<br />

6.0 EMBEDDING FIXTURES IN CONCRETE<br />

6.1 Proper steel templates shall be used for fixing anchor bolts, pipe sleeves etc. to ensure<br />

that they are fixed precisely as per dimensions shown on dr awings. S uch templates<br />

are subject to the Engineer’s approval.