DCPL-K4A02<br />

PAINTING<br />

IS : 117 - Specification for ready mixed paint, brushing, finishing,<br />

exterior, semi-gloss, for general purposes.<br />

IS : 128 - Specification for ready mixed paint, brushing, finishing,<br />

semi-gloss for general purposes, black.<br />

IS : 1477 - Code of practice for painting of ferrons metal<br />

(Part - I & II) in building.<br />

IS : 2074 - Ready mixed paint, air-drying red-oxide zinc chrome<br />

priming.<br />

IS : 2339 - Specification for aluminium paints for general purposes<br />

in dual container.<br />

IS : 2932 - Specification for enamel, synthetic exterior type - I.<br />

IS : 2933 - Specification for enamel, synthetic exterior type - II.<br />

2.4.0 Conformity with Designs<br />

The contractor shall design all connections, supply and fabricate all<br />

steelwork and furnish all connection materials in accordance with the<br />

approved drawings and/or as instructed by the Engineer keeping in view<br />

the maximum utilization of the available sizes and sections of steel<br />

materials. The methods of painting, marking, packing and delivery of all<br />

fabricated materials shall be in accordance with the provisions of the<br />

contract and/or as approved by the Engineer. Provision of all relevant Indian<br />

Standard Specifications and Codes of Practice shall be followed unless<br />

otherwise specified in the contract.<br />

2.5.0 Materials to be used<br />

2.5.1 General<br />

All steel materials shall be free from all imperfections, mill scales, slag<br />

intrusions, laminations, pittings, rusts etc. that may impair their strength,<br />

durability and appearance. All materials shall be of tested quality only unless<br />

otherwise permitted by the Engineer and/or Consultant. If desired by the<br />

Engineer, Test Certificates of materials supplied by the contractor in<br />

respect of each consignment shall be submitted in triplicate. Whenever the<br />

materials are required to be used from unidentified stocks, if permitted by<br />

the Engineer, a random sample shall be tested at an approved laboratory<br />

from each lot of 50 tonnes or less of any particular section.<br />

(PCA.774.S034sca4) V.II-D2/S-IV : 5