TITLE:<br />

SPEC<strong>IF</strong>ICATION NO. PE-TS-360-620-C001<br />

VOLUME - II B<br />

SPEC<strong>IF</strong>IC TECHNICAL<br />

REQUIREMENTS FOR<br />

SECTION - C SUB SECTION: II<br />

REV.NO. 0 DATE: 18.09.2010<br />

ELECTRICAL WORKS<br />

SHEET 3 OF 6<br />

1.08 A temporary aviation obstruction lighting system shall be provided during<br />

construction of the chimney.<br />

1.09 Cables from distribution board to lighting panels/receptacles shall be 1100V<br />

grade, PVC/XLPE insulated armoured aluminum conductor with a minimum<br />

size of 4 mm 2 Cables shall be laid on galvanized sheet steel cable trays. Cables<br />

shall be terminated using double compression type cable glands and cable<br />

lugs.<br />

1.10 Lightning protection system shall comprise minimum 3 vertical air<br />

terminations for each flue liner, horizontal air termination and minimum 4<br />

Nos. of down conductors spaced 90 degrees apart routed all along chimney<br />

height and connected to the earthing system. Above ground level, earthing and<br />

lightning protection system shall comprise galvanized steel strips. These<br />

materials provided at top 12 meters shall have additional coating of 2 mm<br />

thick seamless lead cover or it shall be of stainless steel to take care of<br />

corrosion. Chimney earthing system shall be inter connected to main plant<br />

earthing system.<br />

1.11 Communication system comprising of telephone socket at every internal<br />

platform level and at grade level, necessary wiring installation, junction boxes<br />

etc. shall also be provided. Requirement of telecommunication system as per<br />

pt. no. 18 of spec no. –DCPL-K9A01, doc. no.- V.II-D2/S-XXIV:22 (pg.330)<br />

are to be complied with.<br />

1.12 For various equipment, the technical requirements and practices shall conform<br />

to the relevant clauses of the main plant electrical specification and customer<br />

specification no. –DCPL-K9A01, doc. no.- V.II-D2/S-XXIV:30-33 (pg.338 to<br />

341).<br />

2.00 ELECTRICAL EQUIPMENT SCOPE<br />

The Bidder’s scope of supply, installation, testing and commissioning shall<br />

include but not be limited to the following:<br />

2.01 Lighting of chimney as per specification no. PE-DG-XXX-558-0004<br />

including aviation obstruction lighting system and 15A industrial switch<br />

socket & 63A welding socket.<br />

2.02 Lightning protection & earthing of chimney as per specification no. PES-509-<br />

02A Rev. 0 and PE-DG-XXX-509-0004. Also refer enclosed typical drawing<br />

of Lightning Protection and Earthing system drg. No. PE-DG-179-620-7272<br />

REV.1<br />

2.03 Power Distribution Boards<br />

:<br />

2.03.1 415 V, 3∅, 4 wire AC distribution board (ACDB) as per specification no.<br />

PES-506-05. 415 V, 3∅, 3 wire AC Emergency Lighting distribution board<br />

(ELDB) & Lighting panels (LP) as per Specification no. PES-558-01A .<br />

2.04 Power & control cables HRPVC, armoured, FRLS type 1100 V grade as per<br />

specification no. Section E18 <strong>Volume</strong> II Part B.