DCPL-K4A02<br />

TABLE-IX : QUANTITIES OF MATERIALS REQUIRED FOR 10 SQ.M OF ROAD<br />

SURFACE FOR 2 CM THICK OPEN-GRADED PREMIX CARPET<br />

__________________________________________________________________<br />

Aggregates of Carpet<br />

a) Stone chippings - 12 mm size; passing<br />

20 mm sieve and retained on 10 mm sieve 0.18 Cu.m<br />

b) Stone chippings - 10 mm size; passing<br />

12.5 mm sieve and retained on 6.3 mm sieve 0.09 Cu.m<br />

_______________<br />

Binder for premixing (quantities in terms of straight run bitumen)<br />

Total : 0.27 Cu.m<br />

_______________<br />

a) For 0.18 Cu.m of 12 mm size stone<br />

chippings at 52 kg per Cu.m<br />

9.5 kg<br />

b) For 0.09 Cu.m of 10 mm size stone<br />

chippings at 56 kg per Cu.m<br />

5.1 kg<br />

______________<br />

Total : 14.6 kg<br />

______________<br />

__________________________________________________________________<br />

3.7.3 Construction Operation<br />

3.7.3.1 Weather and Seasonal Limitations<br />

Open-graded premix carpet shall not be laid during rainy weather or when<br />

the base course is damp or wet or when the atmospheric temperature in<br />

shade is 16 Deg.C or below.<br />

3.7.3.2 Preparation of Base<br />

The underlying base on which the bituminous carpet is to be laid shall be<br />

prepared, shaped and conditioned to the specified lines, grade and cross<br />

section in accordance with Table I as directed by the Engineer. The surface<br />

shall be well cleaned by removing caked earth and other foreign matter with<br />

wire brushes, sweeping with brooms and finally dusting with sacks as<br />

necessary.<br />

3.7.3.3 Tack Coat<br />

A tack coat complying with clause 3.5 shall be applied over the base<br />

preparatory to laying of the carpet. Application of tack coat shall, however,<br />

(PCA.775.S034sca7) V.II-D2/S-VII : 20