TITLE:<br />

TECHNICAL SPEC<strong>IF</strong>ICATION FOR<br />

REINFORCED CONCRETE<br />

CHIMNEY<br />

SPEC<strong>IF</strong>ICATION NO. PE-TS-360-620-C001<br />

VOLUME - II B<br />

SECTION - C SUBSECTION : I<br />

REV.NO. 0 DATE 18.09.2010<br />

SHEET<br />

OF<br />

3144 and IS: 3346 a nd/or a s directed by t he Engineer at the Contractor's own cost.<br />

The tests shall be conducted in the presence of the Engineer and the reports of such<br />

testing shall be submitted to the Engineer before application of the material.<br />

12.6 The insulated material shall be protected against weather at all times from delivery up<br />

to completion of work. Insulation material shall not be stacked directly on the<br />

ground. The contractor shall provide covered storage for insulation material<br />

accessories to the satisfaction of the Engineer.<br />

13.0 CONSTRUCTION<br />

13.1 INSULATION<br />

13.1.1 The fixing details shall be as per specification, approved drawings and the directions<br />

of the Engineer.<br />

13.1.2 T he i nsulation s hall be pr ovided i n m ore t han one l ayer and the joints staggered.<br />

Each layer shall be minimum 25 mm thick.<br />

13.1.3 P articular care shall be taken to ensure that all semi rigid resin bonded fibrous slabs<br />

are tightly butted. The insulation shall be tightly secured to the exterior of the liner or<br />

the inner surface or the shell or on and other surface leaving no air gap at the interface<br />

13.1.4 P ins and studs shall be anchored/fixed to the surface receiving insulation at 500 mm<br />

centers maximum horizontally and vertically. Pins and studs shall be minimum 10<br />

gauge and plated. These shall be 25 m m longer than the thickness of insulation.An<br />

alternative arrangement with anchor f asteners i nstead of pins can also be m ade as<br />

approved by the engineer incharge.<br />

13.1.5 The insulation shall be impaled on the studs and secured in place with 63 mm round<br />

or square metal plated speed washers.<br />

13.1.6 20 gauge galvanized wire netting shall be wrapped continuously over external surface<br />

of the insulation. The wire mesh shall be 25 mm hexagonal conforming to IS: 3150.<br />

All joints in the mesh shall be lapped in minimum of 150 mm and tied with 16-gauge<br />

soft annealed wire at 300 mm centers. Lacing will not be permitted.<br />

13.1.7 The insulation shall be fixed after painting the inner surface of the shell with acid and<br />

heat resistant paint.<br />

14.0 COATING S YSTEM O N S TRUCTURAL F RAMING: Acid and heat r esistant<br />

paint as per IS: 158 for surfaces which are not insulated nor protected by galvanising,<br />

high temperature f ormulation for pot entially hot s urfaces m ainly platform framing<br />

system. Two coats of finish paint on two coats of primer is to be applied on complete<br />