TECHNICAL SPEC<strong>IF</strong>ICATION FOR<br />

REINFORCED CONCRETE<br />

CHIMNEY<br />

9.0 SURVEY EQUIPMENT<br />

SPEC<strong>IF</strong>ICATION NO. PE-TS-360-620-C001<br />

VOLUME - II B<br />

SECTION - C SUBSECTION : I<br />

REV.NO. 0 DATE 18.09.2010<br />

SHEET<br />

OF<br />

9.1 The contractor shall have on s ite a good num ber of accurate survey instruments such as<br />

levels, theodolite, staffs, measuring devices, survey umbrellas, etc. to ensure s mooth.<br />

progress of work.<br />

10.0 SPEC<strong>IF</strong>ICATIONS AND CODES<br />

10.1 All works shall be carried out strictly in accordance with the technical specifications<br />

unless ot herwise a pproved by t he E ngineer i n w riting. W here not s pecified i n t he<br />

technical specifications the relevant latest Indian Standards Codes shall be followed.<br />

10.2 Field quality s hall be a dhered t o s trictly i n a ccordance w ith t he s tandards a nd<br />

applicable codes various checks during the process of work at different stages shall be<br />

performed according to the checklist. Tests wherever required for these checks shall<br />

be c onducted by t he c ontractor a t his own cost i n pr esence of t he E ngineer. T he<br />

record of all such checks shall be jointly signed by the Engineer and the contractor<br />

and maintained with the Engineer.<br />

10.3 Any deviations in execution of t he w orks a s a r esult of c hances i n s pecifications.<br />

contract dr awings, i naccurate w orkmanship, t ype, s ize or gr ade of m aterials to be<br />

used etc sha ll be f irst discus sed by the cont ractor w ith the Engineer at site and<br />

feasibility of s uch non -conformances possible ascertained. The cont ractor sha ll<br />

initiate the matter by submitting a Non Conformance Request (NCR). The contractor<br />

shall not proceed with construction or pr eparation of dr awings or pur chase of<br />

materials or r emedial measures for de fective work not c onforming t o s pecifications<br />

without the approval in writing by Engineer on the NCR submitted by the contractor.<br />

10.4 Proprietary Items: All proprietor, items of m aterials s pecified/required as pe r ite m<br />

description s hall be pr ocured f rom t he m anufacturers/reputed s uppliers only after<br />

obtaining the approval of Engineer. Unpriced copies of such order shall be submitted<br />

to the Engineer for any follow up action as deemed fit by the Engineer.<br />

11.0 TECHNICAL INSTRUCTIONS<br />

i) The successful tenderer on receipt of letter of intent shall prepare a de tailed<br />

work pr ogramme i ncluding i tems of w ork w ithin t he ove r a ll time period<br />

allowed and shall submit the same to the Engineer for approval. The drawings<br />

as listed in section 'A' are enclosed with the tender documents.<br />

ii)<br />

iii)<br />

The work ha s t o be t aken up i mmediately on i ssue of w ork or der/letter of<br />

intent/telex and completed within the scheduled time of completion.<br />

The work has to be carried out according to priority that may be fixed by the<br />

site Engineer at site.