(<br />

f<br />

OCPL-K9A01<br />

24. Operation of sllpfonn method of construction Is a continuous one and<br />

it demands continuouslintennediate inspection of accuracies in line,<br />

level, dimensions and position and Immediate rectification of any<br />

noticed delllation. All these ask for personnel of high quality having<br />

constant vigilance over the construction activity.<br />

t<br />

25. While all the activities in effective Implementation of the work needs<br />

utmost care keeping safety of men and material in mind tt Is obligatory<br />

that all activities should be carried out under Ihe. guidance of a<br />

qualified and trained safety Engineer.<br />

Safety measures as listed below must be adhered to but shoul,! ,,,;\<br />

be limited to only thasa :<br />

a) Safety helmets and betts to be provided 10 all supervising staff<br />

and workers. .<br />

b) Safety nels to be provided below both inside and oulside<br />

platforms as instructed by Engineer.<br />

c) Handrailing and 1010 guard 10 be provided around all openings<br />

and platforms. .<br />

d) Regular maintenance of equipmenl, checking of hoists,<br />

scaffoldings etc.<br />

e) Passenger hoist must have muHiple ropes with adeauate<br />

factor of safety.<br />

f) Emergency lights, coloured lamps to be. provided in<br />

(, accordance with relevant Indian Standards' and as<br />

supplemented in Ihe Specification and I!) be operative In case<br />

of sudden power failure Emergency standby generator must<br />

( be kept ready during the enlire period of slipform method 01<br />

construction.<br />

·t~;':.: g) Emergency vehicles; first aid facilities must be kept reedy<br />

.".<br />

duriog .the entire period of Work: .<br />

...<br />

.'<br />

( ,".'- 26. Permissible construction tolerances should be limited to \he following.<br />

'"<br />

(j<br />

t""<br />

Verialion in wall thickness<br />

Variation from Design Diameter<br />

(-) 5 mm,(+) 25 mm<br />