DCPL-K9A01<br />

Vibration shall begin as soon as one batch 0( concrete has been placed and<br />

shalf continue tin the entire section being poured has been thoroughly<br />

consolidated.<br />

To secure even and dense surfaces, free from aggregate pockets, vibration<br />

shan be supplemented by tamping or rodding by hand in the comers of forms<br />

and along the form surfaces whllelhe c:oncrele Is plastic, without damaging<br />

or endangering the stabUity 0( the formwork.<br />

A suffICient number of spare vibrators Including petrol vibrators shall be kept<br />

reedily accessible to the place 0( deposition of the concrete to assure<br />

adequate vibration In case 0( breakdown of those in use.<br />

3.1.6 CurI/Ig of Concrete<br />

Curing 0( exposed surface 0( concrete shaU commence immediately after the<br />

concrete has. set. Exposed sides shall be covered with canvas etc.<br />

immediately afieF ·sltlpping 0( forms, and curing shall be continued for a<br />

period 0( not less than 14 days. reckoned from the date and hour 0(<br />

completion of concreting.' All surfaces of the. pour shaD be kept wet with<br />

water at all times after concreting and lUI the curing period Is over. The<br />

Contracior shaD plan and employ proper equipment and sufficient labour<br />

considered adequate by the Engineer under able supervisor for curing.<br />

3.1.7 Construction Joints<br />

In concreting the chimney shell one full ring lift shall be completed in a day's ,<br />

pour. Before the forrnwork for the following pour starts the horizontal surface<br />

of the Chimney shell shall be chipped, cleaned and washed with water, and<br />

when the forrnwork Is complete, the surface shall be cleaned and washed<br />

again and covered with 1:2 sand cement slurry before fresh concrete is<br />

plaoed. The horizontal construction joints shall be so arranged and made<br />

that, they are regular and neat. No vertical joint shall be allowed. No<br />

separate paYment shaU be allowed to the Contrador for forming JOints or<br />

chipping and cleaning them or cover with slurry prior to concreting. The<br />

nlimber ofCX)nstruction joint shall be kept minimum and the spacing should<br />

not exceed three (3) melers. The Conlractor shall submit to the Engineer,<br />

any proposai of ·providing constflJllllon Joints to facilitate his work, for .the<br />

study end approval of the Engineer well In adVance. ".<br />

3.1.8 Ordinary Concrete<br />

Ordinary concrete Ilke lean concrete shall be of nominal mix as per relevant<br />

cl8I!ses 0( 15:456.<br />

,<br />

(PCA.CO.oo3.SS05CSA24.doc.doc) V.lI-D2JS..XXIV: 16<br />