- Page 1 and 2:
TENDER NO VOLUME PSER:SCT:DPL-C1154
- Page 3 and 4:
VOLUME-IF (SUP) TENDER NO - PSER:SC
- Page 5 and 6:
VOLUME-IF (SUP) TENDER NO - PSER:SC
- Page 7 and 8:
VOLUME-IF (SUP) TENDER NO - PSER:SC
- Page 9 and 10:
TENDER NO VOLUME PSER:SCT:DPL-C1154
- Page 11 and 12:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 13 and 14:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 15 and 16:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 17 and 18:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 19 and 20:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 21 and 22:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 23 and 24:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 25 and 26:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 27 and 28:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 29 and 30:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 31 and 32:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 33 and 34:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 35 and 36:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 37 and 38:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 39 and 40:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 41 and 42:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 43 and 44:
VOLUME-IF (SER) TENDER NO - PSER:SC
- Page 45 and 46:
THE DURGAPUR PROJECTS LIMITED DURGA
- Page 47 and 48:
SPECIFICATION NO. PE-TS-360-620-C00
- Page 49 and 50:
TITLE: SCOPE OF WORK SPECIFICATION
- Page 51 and 52:
TITLE: SCOPE OF WORK SPECIFICATION
- Page 53 and 54:
TITLE: PROJECT INFORMATION SPECIFIC
- Page 55:
TITLE: PROJECT INFORMATION SPECIFIC
- Page 60 and 61:
TITLE: TECHNICAL SPECIFICATION FOR
- Page 62 and 63:
TITLE: TECHNICAL SPECIFICATION FOR
- Page 64 and 65:
iv) TITLE: TECHNICAL SPECIFICATION
- Page 66 and 67:
TITLE: SPECIFIC TECHNICAL REQUIREME
- Page 68 and 69:
TITLE: SPECIFICATION NO. PE-TS-360-
- Page 70 and 71:
TITLE: SPECIFICATION NO. PE-TS-360-
- Page 72 and 73:
SPECIFIC TECHNICAL REQUIREMENT SPEC
- Page 74 and 75:
PEM-6666-0 TITLE SPECIFICATION NO.
- Page 76 and 77:
PEM-6666-0 TITLE SPECIFICATION NO.
- Page 78 and 79:
PEM-6666-0 TITLE SPECIFICATION NO.
- Page 80 and 81:
PEM-6666-0 TITLE SPECIFICATION NO.
- Page 82 and 83:
PEM-6666-0 TITLE SPECIFICATION NO.
- Page 84 and 85:
PEM-6666-0 TITLE SPECIFICATION NO.
- Page 86 and 87:
PEM-6666-0 TITLE SPECIFICATION NO.
- Page 88 and 89:
PEM-6666-0 TITLE SPECIFICATION NO.
- Page 90 and 91:
PEM-6666-0 TITLE SPECIFICATION NO.
- Page 92 and 93:
PEM-6666-0 TITLE SPECIFICATION NO.
- Page 94 and 95:
Title Spec. No.: PE-TS-360-620-C001
- Page 96 and 97:
Title Spec. No.: PE-TS-360-620-C001
- Page 98 and 99:
Title Spec. No.: PE-TS-360-620-C001
- Page 100 and 101:
Title Spec. No.: PE-TS-360-620-C001
- Page 102 and 103:
Title Spec. No.: PE-TS-360-620-C001
- Page 104 and 105:
TITLE: 1X250 MW EXTENSION UNIT-8 AT
- Page 106 and 107:
DCPL-K4A02 VOLUME : II TECHNICAL SP
- Page 108 and 109:
DCPL-K4A02 VOLUME : II-D/2 TECHNICA
- Page 110 and 111:
DCPL-K4A02 VOLUME : II-D/2 SECTION-
- Page 112 and 113:
DCPL-K4A02 VOLUME: II-D/2 SECTION-I
- Page 114 and 115:
DCPL-K4A02 2.5.1 General All materi
- Page 116 and 117:
DCPL-K4A02 g) Excavation, filling a
- Page 118 and 119:
DCPL-K4A02 c) Hard Rock 3.6.0 Earth
- Page 120 and 121:
DCPL-K4A02 Specific permission of E
- Page 122 and 123:
DCPL-K4A02 a magazine. Explosive in
- Page 124 and 125:
DCPL-K4A02 Only such quantities of
- Page 126 and 127:
DCPL-K4A02 3.8.0 Earthwork in Filli
- Page 128 and 129:
DCPL-K4A02 including dumpers, dozer
- Page 130 and 131:
DCPL-K4A02 e) Minimum two tests per
- Page 132 and 133:
DCPL-K4A02 VOLUME : II-D/2 SECTION-
- Page 134 and 135:
DCPL-K4A02 VOLUME : II-D/2 SECTION-
- Page 136 and 137:
DCPL-K4A02 Borrow material required
- Page 138 and 139:
DCPL-K4A02 a) Ordinary Soil This sh
- Page 140 and 141:
DCPL-K4A02 All loose boulders, semi
- Page 142 and 143:
DCPL-K4A02 Two lightning conductors
- Page 144 and 145:
3.5.5 Disposal DCPL-K4A02 300 metre
- Page 146 and 147:
DCPL-K4A02 the responsibility of th
- Page 148 and 149:
DCPL-K4A02 3.7.3 Plinth Filling Sin
- Page 150 and 151:
DCPL-K4A02 The degree of compaction
- Page 152 and 153:
DCPL-K4A02 CONTENT CLAUSE NO. DESCR
- Page 154 and 155:
DCPL-K4A02 d) Submit for approval s
- Page 156 and 157:
DCPL-K4A02 v) Joint sealing strips
- Page 158 and 159:
2.5.3 Aggregates i) Sulphate Resist
- Page 160 and 161:
DCPL-K4A02 e) Water proofing admixt
- Page 162 and 163:
DCPL-K4A02 e) Formwork : Material,
- Page 164 and 165:
DCPL-K4A02 Structural concrete shal
- Page 166 and 167:
DCPL-K4A02 WORKABILITY WATER/CEME N
- Page 168 and 169:
3.8 Workability DCPL-K4A02 Whenever
- Page 170 and 171:
DCPL-K4A02 are in the drum. When ab
- Page 172 and 173:
DCPL-K4A02 or handled in a manner w
- Page 174 and 175:
DCPL-K4A02 3.13.2 Cold Joint Where
- Page 176 and 177:
DCPL-K4A02 3.14.2 Finishing Unforme
- Page 178 and 179:
DCPL-K4A02 used as reinforcement as
- Page 180 and 181:
DCPL-K4A02 3.17 Cold Weather Concre
- Page 182 and 183:
3.20.3 Design DCPL-K4A02 They shall
- Page 184 and 185:
DCPL-K4A02 TABLE - IV SCHEDULE OF R
- Page 186 and 187:
DCPL-K4A02 required grain texture o
- Page 188 and 189:
DCPL-K4A02 Joint sealing strips may
- Page 190 and 191:
DCPL-K4A02 3.23.4 Joint Sealing Com
- Page 192 and 193:
DCPL-K4A02 plumbing shall be done a
- Page 194 and 195:
DCPL-K4A02 N/Super" or approved equ
- Page 196 and 197:
DCPL-K4A02 Alternatively, the overl
- Page 198 and 199:
DCPL-K4A02 4.5.1 Air Entraining Age
- Page 200 and 201: DCPL-K4A02 any other standard pract
- Page 202 and 203: DCPL-K4A02 IS : 3370 - Indian Stand
- Page 204 and 205: DCPL-K4A02 IS : 8043 - Indian stand
- Page 206 and 207: DCPL-K4A02 CONTENTS CLAUSE NO. DESC
- Page 208 and 209: DCPL-K4A02 g) Prepare and furnish d
- Page 210 and 211: DCPL-K4A02 IS : 1852 - Rolling and
- Page 212 and 213: 2.5.2 Steel 2.5.3 Electrodes DCPL-K
- Page 214 and 215: 2.6.2 Steel 2.6.3 Electrodes DCPL-K
- Page 216 and 217: DCPL-K4A02 The sequence of submissi
- Page 218 and 219: DCPL-K4A02 To determine the effecti
- Page 220 and 221: DCPL-K4A02 3.3.4 Welding Sequence I
- Page 222 and 223: DCPL-K4A02 3.8.0 Bearing Plates Pro
- Page 224 and 225: 3.14.3 Procedure DCPL-K4A02 All mem
- Page 226 and 227: 4.2.4 Welding DCPL-K4A02 to commenc
- Page 228 and 229: 4.5.2 Marking DCPL-K4A02 the Owner
- Page 230 and 231: DCPL-K4A02 The Contractor shall quo
- Page 232 and 233: DCPL-K4A02 VOLUME: II-D/2 SECTION-V
- Page 234 and 235: DCPL-K4A02 VOLUME: II-G/2 SECTION-V
- Page 236 and 237: 2.5.0 Material 2.5.1 General DCPL-K
- Page 238 and 239: DCPL-K4A02 3.1.3 Temporary bracing
- Page 240 and 241: NOTE : DCPL-K4A02 When torque wrenc
- Page 242 and 243: DCPL-K4A02 No grouting shall be car
- Page 244 and 245: DCPL-K4A02 4.1.2 Strength Test The
- Page 246 and 247: DCPL-K4A02 difference allowed betwe
- Page 248 and 249: DCPL-K4A02 arrangement and location
- Page 252 and 253: VOLUME : II-D/2 SECTION-VII TECHNIC
- Page 254 and 255: DCPL-K4A02 carriageway as construct
- Page 256 and 257: DCPL-K4A02 Sl. No. Type of Construc
- Page 258 and 259: DCPL-K4A02 The Kerb shall be laid b
- Page 260 and 261: 3.4.2 Materials DCPL-K4A02 Water bo
- Page 262 and 263: DCPL-K4A02 ________________________
- Page 264 and 265: DCPL-K4A02 while the screenings are
- Page 266 and 267: 3.6.2.2 Aggregates DCPL-K4A02 The B
- Page 268 and 269: DCPL-K4A02 3.6.3.1 Weather and Seas
- Page 270 and 271: DCPL-K4A02 When the roller has pass
- Page 272 and 273: DCPL-K4A02 not be necessary when th
- Page 274 and 275: DCPL-K4A02 3.8.3 Construction Opera
- Page 276 and 277: 3.11.0 Culverts DCPL-K4A02 for the
- Page 278 and 279: DCPL-K4A02 d) The pipe culverts sha
- Page 280 and 281: DCPL-K4A02 3.15.1 Finish Unless oth
- Page 282 and 283: DCPL-K4A02 VOLUME : II-D/2 SECTION-
- Page 284 and 285: DCPL-K4A02 VOLUME : II-D/2 SECTION-
- Page 286 and 287: DCPL-K4A02 Brickwork in superstruct
- Page 288 and 289: DCPL-K4A02 shall be as mentioned. S
- Page 290 and 291: DCPL-K4A02 CONTENT CLAUSE NO. DESCR
- Page 292 and 293: DCPL-K4A02 For sand cement plaster,
- Page 294 and 295: 2.2.4 Curing DCPL-K4A02 with a stee
- Page 296 and 297: DCPL-K4A02 Finish to masonry and co
- Page 298 and 299: DCPL-K4A02 CONTENT CLAUSE NO. DESCR
- Page 300 and 301:
DCPL-K4A02 1.0.1 Base 1.0.2 Sequenc
- Page 302 and 303:
DCPL-K4A02 The underbed for floors
- Page 304 and 305:
DCPL-K4A02 it just workable shall b
- Page 306 and 307:
e) Curing DCPL-K4A02 The base concr
- Page 308 and 309:
d) Laying 2.1.7 Mastic Asphalt Fini
- Page 310 and 311:
DCPL-K4A02 b) Tiles : Terrazzo The
- Page 312 and 313:
DCPL-K4A02 d) Laying As per clause
- Page 314 and 315:
DCPL-K4A02 examined and cleaned, jo
- Page 316 and 317:
DCPL-K4A02 cleaned with soft soap,
- Page 318 and 319:
DCPL-K4A02 h) Performance i) Precau
- Page 320 and 321:
DCPL-K4A02 CONTENT CLAUSE NO. DESCR
- Page 322 and 323:
DCPL-K4A02 2.4.0 Strength 2.5.0 Sur
- Page 324 and 325:
DCPL-K4A02 CONTENT CLAUSE NO. DESCR
- Page 326 and 327:
DCPL-K4A02 Flush doors shall be hol
- Page 328 and 329:
DCPL-K4A02 3.3.5 Drawers Shall oper
- Page 330 and 331:
DCPL-K4A02 CONTENT CLAUSE NO. DESCR
- Page 332 and 333:
DCPL-K4A02 3.0.0 INSTALLATION 3.1.0
- Page 334 and 335:
DCPL-K4A02 CONTENT CLAUSE NO. DESCR
- Page 336 and 337:
2.2.0 Fabrication DCPL-K4A02 Concea
- Page 338 and 339:
DCPL-K4A02 e) Door Threshold Door t
- Page 340 and 341:
2.5.0 Assembly & Erection at Site D
- Page 342 and 343:
DCPL-K4A02 3.2.0 For Installed Item
- Page 344 and 345:
DCPL-K4A02 g) Glazed beads, weather
- Page 346 and 347:
DCPL-K4A02 CONTENT CLAUSE NO. DESCR
- Page 348 and 349:
DCPL-K4A02 d) Obscure glass shall h
- Page 350 and 351:
DCPL-K4A02 VOLUME : II-D/2 SECTION-
- Page 352 and 353:
DCPL-K4A02 VOLUME : II-D/2 SECTION-
- Page 354 and 355:
DCPL-K4A02 all work shall be as per
- Page 356 and 357:
DCPL-K4A02 CONTENT CLAUSE NO. DESCR
- Page 358 and 359:
DCPL-K4A02 2.2.0 Erection 2.2.1 Bra
- Page 360 and 361:
DCPL-K4A02 3.0.0 ACCEPTANCE CRITERI
- Page 362 and 363:
DCPL-K4A02 CONTENT CLAUSE NO. DESCR
- Page 364 and 365:
DCPL-K4A02 such materials shall be
- Page 366 and 367:
2.1.3 Metal DCPL-K4A02 patch filled
- Page 368 and 369:
DCPL-K4A02 Surface to be coated wit
- Page 370 and 371:
DCPL-K4A02 SILICA FLOUR FLOW CONTRO
- Page 372 and 373:
DCPL-K4A02 VOLUME : II-D/2 SECTION-
- Page 374 and 375:
DCPL-K4A02 VOLUME : II-D/2 SECTION-
- Page 376 and 377:
2. 4.0 Fillets DCPL-K4A02 efficienc
- Page 378 and 379:
DCPL-K4A02 3.0.0 ACCEPTANCE CRITERI
- Page 380 and 381:
DCPL-K4A02 CONTENT CLAUSE NO. DESCR
- Page 382 and 383:
DCPL-K4A02 hook or J- bolts shall b
- Page 384 and 385:
DCPL-K4A02 CONTENT CLAUSE NO. DESCR
- Page 386 and 387:
DCPL-K4A02 e) Lead (Not to be used
- Page 388 and 389:
DCPL-K4A02 ordinate with the buildi
- Page 390 and 391:
DCPL-K4A02 Erection of tanks shall
- Page 392 and 393:
DCPL-K4A02 IS:1239 (Pt. I & II) : S
- Page 394 and 395:
DCPL-K4A02 CONTENT CLAUSE NO. DESCR
- Page 396 and 397:
DCPL-K4A02 The gutters shall be mad
- Page 398 and 399:
2.3.6 Ducts DCPL-K4A02 be such as t
- Page 400 and 401:
DCPL-K4A02 2.4.0 Trenches and other
- Page 402 and 403:
2.5.6 Glass shelves 2.5.7 Towel rai
- Page 404 and 405:
DCPL-K4A02 All soil pipes, waste pi
- Page 406 and 407:
DCPL-K4A02 IS:1538 - IS:1230 - IS:3
- Page 408 and 409:
DCPL-K4A02 CONTENTS CLAUSE NO. DESC
- Page 410 and 411:
2.02.01 Treatment of Column Pits, W
- Page 412:
VOLUME : II-D/2 ANNEXURE A
- Page 415 and 416:
j { f. \ DCPl-K9A01 VOLUME: II-Dj2
- Page 417 and 418:
OCPl·K9A01 ,i IS:269 IS:383 15:432
- Page 419 and 420:
DCPL-K9A01 18:2386 (Part-VIII) 18:2
- Page 421 and 422:
i DCPL-K9AOl blocks and details of
- Page 423 and 424:
DCPl-K9A01 2.5.10 Insulations a) On
- Page 425 and 426:
( t DCPL·K9A01 2.6.6 Paints 2.6.1
- Page 427 and 428:
DCPL-K9AOl MIX PROPORTIONS (BY WEIG
- Page 429 and 430:
UMITS Of CONSISTENCY DCPL-K9A01 Deg
- Page 431 and 432:
OCPl-K9A01 3.2.0 Reinforcement 3.2.
- Page 433 and 434:
, ( OCPL-K9A01 established to suit
- Page 435 and 436:
.} ,. DCPL·K9A01 prevent overioadi
- Page 437 and 438:
( f OCPL-K9A01 24. Operation of sll
- Page 439 and 440:
DCPL-K9A01 a) Inlemal diameter shal
- Page 441 and 442:
DCPL-K9A01 created one shall be wel
- Page 443 and 444:
l ':.i. ( f DCPl-K9A01 additional s
- Page 445 and 446:
DCPL-K9A01 3.10.5 All avialion fixt
- Page 447 and 448:
! OCPL-K9A01 ii) Ground Conductor 4
- Page 449 and 450:
4.6.0 Insulations DCPL-K9A01 The In
- Page 451 and 452:
{ DCPL·K9A01 5.2.5 Reports Followi
- Page 454 and 455:
OCPL-K9AOI CONTENT aAUSENO. DESCRI
- Page 456 and 457:
DCPL-K9AOl iii) Fabricated sandwich
- Page 458 and 459:
DCPL-K9AOl 3.00.00 3.01.00 3.01.01
- Page 460 and 461:
TITLE: 1X250 MW EXTENSION UNIT-8 AT
- Page 462 and 463:
TITLE SPECIFICATION NO. PES-509-02A
- Page 464 and 465:
TITLE SPECIFICATION NO. PES-509-02A
- Page 466:
TITLE SPECIFICATION NO. PES-509-02A
- Page 495:
TITLE: LIGHTING NOTES AND DETAILS L
- Page 521 and 522:
. S. NO. 1 COMPONENT / OPERATION 2
- Page 523 and 524:
TITLE: SPECIFIC TECHNICAL REQUIREME
- Page 525 and 526:
TITLE: SPECIFIC TECHNICAL REQUIREME
- Page 527 and 528:
Clause No. POWER AND CONTROL CABLES
- Page 529 and 530:
. . S. NO. 1 COMPONENT / OPERATION
- Page 531 and 532:
. . S. NO. 1 COMPONENT / OPERATION
- Page 533:
. . S. NO. 1 COMPONENT / OPERATION
- Page 545 and 546:
TITLE: LIGHTING DISTRIBUTION BOARD
- Page 547 and 548:
TITLE: LIGHTING DISTRIBUTION BOARD
- Page 549 and 550:
TITLE: LIGHTING DISTRIBUTION BOARD
- Page 551 and 552:
TITLE: LIGHTING DISTRIBUTION BOARD
- Page 553 and 554:
TITLE: LIGHTING DISTRIBUTION BOARD
- Page 555 and 556:
TITLE: LIGHTING DISTRIBUTION BOARD
- Page 557 and 558:
TITLE: LIGHTING DISTRIBUTION BOARD
- Page 559:
TITLE: LIGHTING DISTRIBUTION BOARD