DCPL-K4A02<br />

Quality Plan.<br />

2.7.0 Information regarding Site Conditions<br />

Boring and sub-surface data regarding the nature of soil, rock, sub-soil<br />

water etc. shown on drawings or otherwise furnished to the Contractor<br />

shall be taken as a guidance only and variation therefrom shall not affect<br />

the terms of the Contract. The Contractor must satisfy himself regarding<br />

the character and volume of all work under this contract and expected<br />

surface, sub-surface and/or sub-soil water to be encountered. He must<br />

also satisfy himself about the general conditions of site and ascertain the<br />

existing and future construction likely to come up during the execution of<br />

the Contract so that he may evolve a realistic programme of execution.<br />

3.0.0 EXECUTION<br />

3.1.0 General<br />

The work shall be undertaken in accordance with the lines,<br />

levels,grades and details shown on the drawings, specification and the<br />

approved method of work.<br />

The works shall be carried out in a workman like manner without<br />

endengering the safety of nearby structures, roads, railway tracks,<br />

cable, pipelines, etc. and without causing hindrance to construction<br />

activities.<br />

Suitable approaches, fencing, area lighting and temporary works required<br />

for the works shall be provided by the contractor. Sturdy and elegent<br />

fencing is to be provided around the top edge of the exavation as well as<br />

the bottom of the fill at the surplus disposal area where damping from a<br />

high bench is in progress, if directed by the Engineer. Adequate area<br />

lighting shall be provided by the contractor, if night work is undertaken.<br />

The Contractor shall submit a proposal covering the proposed<br />

excavation and placement of fill material for approval of the Engineer.<br />

The proposal shall include but not be limited to the following.<br />

a) Mobilisation and demobilisation of plant<br />

b) Proposed plant and equipment, labour resources & supervision.<br />

c) Details of proposed method of clearing and grubbing for each area of<br />

cut and fill.<br />

d) Drawings showing the areas for placement of material.<br />

e) Management of excavation and filling works i.e., control of setting out,<br />

testing procedures, handling, temporary stockpiles, etc.<br />

f) Temporary works proposals<br />

(PCA.774.S034sca) V.II-D2/S-I : 4