Central electricity authority Annual Report 2009-10<br />
CHAPTER – 8<br />
DESIGN & ENGINEERING SERVICES<br />
8.1 Design & Engineering of Hydro<br />
Electric Projects<br />
Central Electricity Authority renders<br />
design & engineering services for detailed<br />
engineering to Hydro Power Projects under<br />
execution in the Central/State Sectors and<br />
neighbouring countries. Design & Engineering<br />
includes complete design, techno-economic<br />
analysis, preparation of specifications, tender<br />
evaluation, selection and sizing of equipments,<br />
detailed layout and schematic drawings for<br />
hydro turbine, generator, transformer, switchyard<br />
equipment and other auxiliaries.<br />
The legacy of CEA in rendering the design<br />
and engineering of hydro electric projects is for a<br />
period of 50 years since 1960. Seventy five (75)<br />
hydro electric projects in India and neighbouring<br />
countries having aggregate installed capacity of<br />
over 15,757 MW (details given in Annexure-8A)<br />
which were completely designed and engineered<br />
by this organisation during this period are in<br />
successful commercial operation. The design<br />
consultancy of hydro electric projects includes<br />
projects with conventional hydro generating<br />
units, bulb/tubular type units, pumped storage<br />
schemes and underground <strong>power</strong> stations with<br />
unit capacity from few KW to 250 MW. CEA<br />
is fully equipped to provide state-of-the-art<br />
design and engineering services for hydro <strong>power</strong><br />
projects of any type and capacity.<br />
8.2 Programme and Achievement<br />
during 2009-10<br />
During 2009-10, CEA continued<br />
consultancy services for design and engineering<br />
of electrical and mechanical works of ten (10)<br />
hydro electric projects. Out of these, Eight<br />
(8) projects are in India and two (2) are in<br />
neighbouring countries with aggregate installed<br />
capacity of about 3363 MW including large<br />
hydro <strong>power</strong> projects such as Loharinag Pala<br />
(4x150 MW), Tapovan Vishnugad (4x130 MW)<br />
and Punatsangchu St.I (6x200 MW), Bhutan.<br />
The hydro <strong>power</strong> projects for which design &<br />
engineering services were rendered by CEA<br />
during 2009-10 are as given below:<br />
Hydro Power Stations for which Design & Engineering Services<br />
are being rendered by CEA<br />
S.No Project State/Executing Agency Capacity (MW)<br />
Northern Region<br />
1. Koteshwar Uttarakhand/THDC 4x100<br />
2. Loharinag Pala Uttarakhand /NTPC 4x150<br />
3. Tapovan Vishnugad Uttarakhand /NTPC 4x130<br />
4. Rampur * Himachal Pradesh/SJVNL 6x68.67<br />
North Eastern Region<br />
5. Myntdu Leshka Meghalaya/MeSEB 2x42<br />
6. Myntdu Leshka(Extn.) Meghalaya/MeSEB 1x42<br />
7. Ganol Meghalaya/MeSEB 3x7.5<br />
8. New Umtru * Meghalaya/MeSEB 2x20<br />