Central electricity authority Annual Report 2009-10<br />

CHAPTER – 8<br />

DESIGN & ENGINEERING SERVICES<br />

8.1 Design & Engineering of Hydro<br />

Electric Projects<br />

Central Electricity Authority renders<br />

design & engineering services for detailed<br />

engineering to Hydro Power Projects under<br />

execution in the Central/State Sectors and<br />

neighbouring countries. Design & Engineering<br />

includes complete design, techno-economic<br />

analysis, preparation of specifications, tender<br />

evaluation, selection and sizing of equipments,<br />

detailed layout and schematic drawings for<br />

hydro turbine, generator, transformer, switchyard<br />

equipment and other auxiliaries.<br />

The legacy of CEA in rendering the design<br />

and engineering of hydro electric projects is for a<br />

period of 50 years since 1960. Seventy five (75)<br />

hydro electric projects in India and neighbouring<br />

countries having aggregate installed capacity of<br />

over 15,757 MW (details given in Annexure-8A)<br />

which were completely designed and engineered<br />

by this organisation during this period are in<br />

successful commercial operation. The design<br />

consultancy of hydro electric projects includes<br />

projects with conventional hydro generating<br />

units, bulb/tubular type units, pumped storage<br />

schemes and underground <strong>power</strong> stations with<br />

unit capacity from few KW to 250 MW. CEA<br />

is fully equipped to provide state-of-the-art<br />

design and engineering services for hydro <strong>power</strong><br />

projects of any type and capacity.<br />

8.2 Programme and Achievement<br />

during 2009-10<br />

During 2009-10, CEA continued<br />

consultancy services for design and engineering<br />

of electrical and mechanical works of ten (10)<br />

hydro electric projects. Out of these, Eight<br />

(8) projects are in India and two (2) are in<br />

neighbouring countries with aggregate installed<br />

capacity of about 3363 MW including large<br />

hydro <strong>power</strong> projects such as Loharinag Pala<br />

(4x150 MW), Tapovan Vishnugad (4x130 MW)<br />

and Punatsangchu St.I (6x200 MW), Bhutan.<br />

The hydro <strong>power</strong> projects for which design &<br />

engineering services were rendered by CEA<br />

during 2009-10 are as given below:<br />

Hydro Power Stations for which Design & Engineering Services<br />

are being rendered by CEA<br />

S.No Project State/Executing Agency Capacity (MW)<br />

Northern Region<br />

1. Koteshwar Uttarakhand/THDC 4x100<br />

2. Loharinag Pala Uttarakhand /NTPC 4x150<br />

3. Tapovan Vishnugad Uttarakhand /NTPC 4x130<br />

4. Rampur * Himachal Pradesh/SJVNL 6x68.67<br />

North Eastern Region<br />

5. Myntdu Leshka Meghalaya/MeSEB 2x42<br />

6. Myntdu Leshka(Extn.) Meghalaya/MeSEB 1x42<br />

7. Ganol Meghalaya/MeSEB 3x7.5<br />

8. New Umtru * Meghalaya/MeSEB 2x20<br />