Central electricity authority Annual Report 2009-10<br />

& Power Development Department,<br />

Government of Sikkim for their Central<br />

Load Despatch Centre (CLDC) Phase-II.<br />

The Memorandum of Understanding has<br />

been signed for taking up the job.<br />

c) CEA rendered technical consultancy to<br />

Meghalaya State Electricity Board (MeSEB)<br />

for Tele-communication and SCADA<br />

system. The scheme is at advance stage of<br />

implementation.<br />

d) Technical support and input has been<br />

provided for the project ‘Salma Dam HEP,<br />

Afghanistan’ through M/s WAPCOS for<br />

PLCC equipment and 48V D C <strong>power</strong> supply<br />

system, EPABX system and associated<br />

accessories.<br />

e) NCA has installed an RTU at River Bed<br />

Power House (RBPH) at Narmada Complex<br />

in Kevadia, Gujarat to enable transmission<br />

of data to Western Regional Load Despatch<br />

Centre (WRLDC). CEA has provided<br />

technical inputs to NCA.<br />

f) CEA officers participated in the discussions<br />

in the meetings organized by BIS, CIGRE,<br />

etc. A meeting of Fibre Optics, Fibres, Cables<br />

and Devices Sectional Committee LITD 11<br />

was organized by BIS on 21 st December,<br />

2009 at New Delhi to discuss Indian<br />

Standard on Fibre Optics. CEA officers<br />

*******<br />

participated in the discussions organized<br />

by BIS regarding Power System Control<br />

and Associated communications- Sectional<br />

Committee- LITD 10 in joint session with<br />

SCADA Working Group for Power Sector<br />

to discuss Indian Standard on SCADA.<br />

8.4 Scrutiny of Bill of Quantity (BoQ) of<br />

Small HE Schemes Certification as<br />

Capital Goods<br />

Bill of Quantity (BoQ) of 8 (eight) small/<br />

mini HE schemes viz. Manjanadaka (2x5 MW),<br />

Dadupur (4x1.5 MW), Kadamane (4x7.5 MW),<br />

Varahi Tail Race (2x7.5 MW), Dandela (3x4.35<br />

MW), Birahi Ganga (2x2.4 MW), Somanamardi<br />

(1x6 MW), Somavathi (2x3 MW) comprising of<br />

electromechanical equipment for the generating<br />

units, associated auxiliaries, transmission lines<br />

etc. received for the purpose of certification as<br />

capital goods were examined and commented<br />

upon.<br />

8.5 Assessment of Requirement of<br />

Electrical Equipment and Steel for<br />

12 th & 13 th Plan Periods<br />

An assessment regarding the requirement<br />

of electrical equipment and steel for various<br />

hydro projects to be taken up during 12 th and 13 th<br />

Plans was made.<br />

Tehri HPP - Machine Hall<br />