Central electricity authority Annual Report 2009-10<br />
Sl.<br />
No.<br />
Annexure - 3C<br />
(Item No.3.13)<br />
TRANSMISSION LINES COMPLETED DURING 2009-10 (1/8)<br />
Name of the transmission<br />
lines<br />
No.<br />
of<br />
ckts<br />
Executing<br />
Agency<br />
Line<br />
Length<br />
(CKM)<br />
Stringing<br />
Comptd.<br />
upto<br />
Mar-09<br />
(CKM)<br />
Stringing<br />
during<br />
2009-10<br />
(CKM)<br />
1 2 3 4 5 6 7 8<br />
I. 765 KV LINES<br />
Month of<br />
Completion<br />
1. Bina (PG) – Gwalior (PG) S/C POWERGRID 233 65 168 Feb-10<br />
2nd S/C (initially to be<br />
operated at 400kV)<br />
2. Seoni - Bina (initially to be S/C POWERGRID 293 242 51 Mar-10<br />
operated at 400KV)<br />
TOTAL CKM OF FULLY COMPLETED (CS)<br />
526 219<br />
DURING THE YEAR<br />
TOTAL CKM OF PARTIALLY COMPLETED (CS) DURING THE YEAR 226<br />
TOTAL (CS) 445<br />
TOTAL (ALL INDIA) 445<br />
II. ± 500 kV HVDC LINES<br />
TOTAL CKM OF FULLY COMPLETED (CS)<br />
0 0 0<br />
DURING THE YEAR<br />
TOTAL CKM OF PARTIALLY COMPLETED (CS) DURING THE YEAR 280<br />
TOTAL (CS) 0 280<br />
TOTAL (ALL INDIA)<br />
III. 400 KV LINES<br />
PGCIL<br />
1. Zerda - kankroli D/C POWERGRID 470 470 0 Apr-09<br />
2. LILO of Ramagundam - D/C POWERGRID 28 25 3 Jul-09<br />
Khammam at Warangal<br />
3. LILO of 1 ckt of Madurai D/C POWERGRID 98 94 4 Jul-09<br />
(PG) - Trichy (PG) at<br />
Karaikudi<br />
4. Bhiwadi - Agra D/C POWERGRID 418 405 13 Aug-09<br />
5. LILO of 1 st ckt. of<br />
D/C POWERGRID 55 52 3 Aug-09<br />
Kankroli-Zerda at Bhinmal<br />
6. Neyveli TS -II - Pugalur D/C POWERGRID 398 398 0 Aug-09<br />
7. Neyveli (Expn.) Sw. Yd.- 2xS/C POWERGRID 3 3 0 Sep-09<br />
Neyveli (existing) Sw. Yd.<br />
8. LILO of Kahalgaon-Patna D/C POWERGRID 104 101 3 Oct-09<br />
at Barh<br />
9. Akola - Aurangabad D/C POWERGRID 482 482 0 Dec-09<br />