Central electricity authority Annual Report 2009-10<br />

Sl.<br />

No.<br />

Name of<br />

Utility<br />

Name of<br />

Station<br />

Unit No.<br />

Year of<br />

Commissioning<br />

Capacity<br />

(MW)<br />

Completion<br />

Schedule<br />

(Actual /<br />

Targeted)<br />

Punjab<br />

19. PSEB Bathinda 3 1978 110 2010-11<br />

(Target)<br />

20. 4 1979 110 2011-12<br />

(Target)<br />

Total 2 220<br />

21. Ropar 1 1984 210 Likely to<br />

slip beyond<br />

22. 2 1985 210 11 th Plan<br />

Total 2 420<br />

Gujarat<br />

23. GSECL Ukai 1 1976 120 2008-09<br />

(Actual)<br />

24. 2 1976 120 2009-10<br />

(Actual)<br />

(Page 2/3)<br />

Present status / Expected Date<br />

of Completion<br />

Order placed on BHEL on<br />

6.11.2006. S/d on unit -3 have<br />

been taken from 14.1.2010,<br />

dismantling work started. Unit<br />

expected to be recommisioned by<br />

Oct. 2010. Thereafter unit-4 will<br />

be taken up.<br />

RLA completed, Order expected to<br />

be placed in 2009-10, completion<br />

in 12 th Plan.<br />

Unit -1 was taken under s/d<br />

on 06.9.2006 for LE works,<br />

synchronised on 24.5.2008. Unit<br />

running at 100 -105 MW load.<br />

Unit -2 was taken under s/d<br />

for LE on 12 th August’08.<br />

Synchronised on 24-2- 2010.<br />

Total 2 240<br />

25. Gandhinagar 1 1977 120 Order awarded to BHEL on 28<br />

26. 2 1977 120<br />

May 2007. BHEL has supplied<br />

material at site.<br />

Madhya Pradesh<br />

27. MPPGCL Amarkantak<br />

Ext.<br />

Total 2 240<br />

1 1977 120 201-12<br />

(Target)<br />

28. 2 1977 120 2010-11<br />

(Target)<br />

Total 2 240<br />

West Bengal<br />

29. WBPDCL Bandel 5 1982 210 Likely to<br />

slip beyond<br />

11 th Plan<br />

Bihar<br />

30. BSEB Barauni<br />

Total 1 210<br />

6 1983 110 2011-12<br />

(Target)<br />

31. 7 1985 110 2011-12<br />

(Target)<br />

Total 2 220<br />

32. KBUNL Muzaffarpur 1 1985 110 2011-12<br />

(Target)<br />

33. 2 1986 110 2011-12<br />

(Target)<br />

Total 2 220<br />

TOTAL OF STATE SECTOR (1.0) 33 4524<br />

Works on 11 packages out of 12<br />

completed. Order for Turbine<br />

package placed on NASL in<br />

July 07. Works on U-2 bas<br />

been commenced from 26.7.09.<br />

Completion schedule in 2010-11.<br />

Taken up under World Bank<br />

programme, 1 st stage Bids<br />

for BTG packages have been<br />

evaluated and report sent to WB<br />

for their no objection.<br />

Unit #6 has been restored by<br />

BHEL under Rashtriya Sam Vikas<br />

Yojana. LOA has been awarded to<br />

BHEL on 15 th Feb’10.<br />

Unit #2 has been restored under<br />

RSVY. LOA awarded on 15 th<br />

April 2010.<br />

"Energy Saved is Energy Generated"<br />

175