Central electricity authority Annual Report 2009-10<br />
Sl.<br />
No.<br />
Name of<br />
Utility<br />
Name of<br />
Station<br />
Unit No.<br />
Year of<br />
Commissioning<br />
Capacity<br />
(MW)<br />
Completion<br />
Schedule<br />
(Actual /<br />
Targeted)<br />
Punjab<br />
19. PSEB Bathinda 3 1978 110 2010-11<br />
(Target)<br />
20. 4 1979 110 2011-12<br />
(Target)<br />
Total 2 220<br />
21. Ropar 1 1984 210 Likely to<br />
slip beyond<br />
22. 2 1985 210 11 th Plan<br />
Total 2 420<br />
Gujarat<br />
23. GSECL Ukai 1 1976 120 2008-09<br />
(Actual)<br />
24. 2 1976 120 2009-10<br />
(Actual)<br />
(Page 2/3)<br />
Present status / Expected Date<br />
of Completion<br />
Order placed on BHEL on<br />
6.11.2006. S/d on unit -3 have<br />
been taken from 14.1.2010,<br />
dismantling work started. Unit<br />
expected to be recommisioned by<br />
Oct. 2010. Thereafter unit-4 will<br />
be taken up.<br />
RLA completed, Order expected to<br />
be placed in 2009-10, completion<br />
in 12 th Plan.<br />
Unit -1 was taken under s/d<br />
on 06.9.2006 for LE works,<br />
synchronised on 24.5.2008. Unit<br />
running at 100 -105 MW load.<br />
Unit -2 was taken under s/d<br />
for LE on 12 th August’08.<br />
Synchronised on 24-2- 2010.<br />
Total 2 240<br />
25. Gandhinagar 1 1977 120 Order awarded to BHEL on 28<br />
26. 2 1977 120<br />
May 2007. BHEL has supplied<br />
material at site.<br />
Madhya Pradesh<br />
27. MPPGCL Amarkantak<br />
Ext.<br />
Total 2 240<br />
1 1977 120 201-12<br />
(Target)<br />
28. 2 1977 120 2010-11<br />
(Target)<br />
Total 2 240<br />
West Bengal<br />
29. WBPDCL Bandel 5 1982 210 Likely to<br />
slip beyond<br />
11 th Plan<br />
Bihar<br />
30. BSEB Barauni<br />
Total 1 210<br />
6 1983 110 2011-12<br />
(Target)<br />
31. 7 1985 110 2011-12<br />
(Target)<br />
Total 2 220<br />
32. KBUNL Muzaffarpur 1 1985 110 2011-12<br />
(Target)<br />
33. 2 1986 110 2011-12<br />
(Target)<br />
Total 2 220<br />
TOTAL OF STATE SECTOR (1.0) 33 4524<br />
Works on 11 packages out of 12<br />
completed. Order for Turbine<br />
package placed on NASL in<br />
July 07. Works on U-2 bas<br />
been commenced from 26.7.09.<br />
Completion schedule in 2010-11.<br />
Taken up under World Bank<br />
programme, 1 st stage Bids<br />
for BTG packages have been<br />
evaluated and report sent to WB<br />
for their no objection.<br />
Unit #6 has been restored by<br />
BHEL under Rashtriya Sam Vikas<br />
Yojana. LOA has been awarded to<br />
BHEL on 15 th Feb’10.<br />
Unit #2 has been restored under<br />
RSVY. LOA awarded on 15 th<br />
April 2010.<br />
"Energy Saved is Energy Generated"<br />
175