Central electricity authority Annual Report 2009-10<br />

(3/3)<br />

Special meeting of the Standing Committee on Power System Planning of WR held on 18-04-2009 at WRPC<br />

Mumbai<br />

a)<br />

b)<br />

c)<br />

d)<br />

e)<br />

f)<br />

g)<br />

h)<br />

i)<br />

Discussion on the methodology and procedure adopted by PGCIL for grant of Open access in the Grid<br />

Transmission System Associated with the Tilaiya Ultra Mega Power Project (4000 MW) in Jharkhand, Nabinagar<br />

(1000MW) of Railways and NTPC, Barh-II (1320 MW), Rihand-IV (1000MW), Vindhyachal-IV (1000MW) and<br />

Mauda (1000MW) of NTPC, and IPPs in Jharkhand, Orissa, MP, Chattisgarh, and Maharashtra<br />

Transmission system connected with Vindhyachal pooling station and phasing of transmission works<br />

Associated 220 kV Line bays along with 400/220kV ICTS<br />

Requirement of Bus Reactors at Nagda/Rajgarh to control high voltages in Dhule Area<br />

LILO in Vapi-Magarwara 220 kV D/C line at Ringanwada 220/66 kV S/S<br />

Interconnection of state grid with the CTU points<br />

Interconnection of Pirana-Bachao 400 kV substation.<br />

Non- Availability of bays at Aurangabad substation of MSETCL<br />

29 th meeting of the Standing Committee on Power System Planning in Western Region held on 10-09-2009 at<br />

Ahmedabad<br />

a) Review of progress on earlier agreed Transmission Schemes<br />

b) Transmission system associated with IPPs located in Orissa, Jharkhand, West Bengal, Madhya Pradesh and<br />

Chattishgarh.<br />

c) Transmission system associated with Mauda (2X500 MW) generation project of NTPC.<br />

d) Transmission System associated with Vindhyachal-IV (1000MW) and Rihand-III (1000MW) generation projects<br />

of NTPC<br />

e) Connectivity of proposed 400 kV substation of CSPTCL at Bilaspur with 765/400 kV Bilaspur Pooling Station<br />

(WR Pooling Station).<br />

f) Connectivity of proposed 220 /132 kV at Raigarh and Kumhari of India Railway with existing Raigarh and Raipur<br />

sub-station of POWERGRID for wheeling of <strong>power</strong> from Nabinagar generation project in ER to their traction<br />

sub-stations in Chhattisgarh.<br />

g) Intra State Transmission system at 400kV and 765kV in Maharashtra<br />

h) MSETCL proposal of connectivity of 400 kV Sholapur with South Solapur (PG) under Central Sector<br />

i) Provision of 400/220 kV sub-station to Union Territory of DNH (Dadar and Nagar Haveli) and Daman & Diu<br />

j) Evacuation of <strong>power</strong> from generation projects coming up in Sikkim and Bhutan<br />

Open Access Applications pertaining to New Generation Projects in Southern Region with target beneficiaries in<br />

Western/Northern/Southern Region<br />

144<br />

"CEA-Helping the Transformation of Indian Power Sector"