Central electricity authority Annual Report 2009-10<br />
‣ Transmission System associated with Tehri<br />
PSP.<br />
‣ Northern Regional System Strengthening<br />
Scheme-XXI.<br />
‣ Northern Regional System Strengthening<br />
Scheme-XXII.<br />
‣ System Strengthening Scheme in NR for<br />
Tilaiya, Nabinagar and Barh-II.<br />
‣ Northern Regional System Strengthening<br />
Scheme-XXIII.<br />
‣ Transmission system associated with Mauda<br />
generation project.<br />
‣ Transmission system associated with<br />
Vindhyachal–IV generation project.<br />
‣ Transmission system associated with IPPs<br />
in Madhya Pradesh, Chhattishgarh, Orissa<br />
and Jharkhand.<br />
‣ Prior approval of the Government under<br />
Section 68 of the Electricity Act, 2003 for<br />
Split Bus Arrangement & Reconfiguration /<br />
Shifting of Terminating lines at 400 kV<br />
Raipur Substation.<br />
‣ Prior approval of the Government under<br />
Section 68 of the Electricity Act, 2003<br />
for installation of overhead lines under<br />
Transmission System associated with<br />
Mauda (1000 MW) generation project.<br />
‣ Prior approval of the Government under<br />
Section 68 of the Electricity Act, 2003<br />
for installation of overhead lines under<br />
Transmission System associated with<br />
Rihand-III (2x500 MW) and Vindhyachal-<br />
IV (2x500 MW) generation project.<br />
‣ Prior approval of the Government<br />
under Section 68 of the Electricity Act,<br />
2003 for Transmission System for IPP<br />
generation projects in Madhya Pradesh &<br />
Chhattisgarh.<br />
‣ Approval of the Government under<br />
Section 68 of the Electricity Act, 2003 for<br />
Transmission System for <strong>development</strong> of<br />
pooling stations in Sikkim and transfer of<br />
<strong>power</strong> to a new pooling station in Northern<br />
Part of West Bengal/ Bihar.<br />
‣ Prior Approval of the Government under<br />
Section 68 of the Electricity Act, 2003 for<br />
Transmission System of various IPPs in<br />
Chhattisgarh coming up in different stages.<br />
3.6 Examination and appraisal of<br />
Transmission Schemes for approval<br />
under Section 164 of Electricity Act,<br />
2003 during 2009-10<br />
i) 400kV Teesta-Kishengang D/C Quad<br />
line via Magan pooling station by JV of<br />
POWERGRID and M/s Teesta Urja Ltd.<br />
ii) Laying of inter-state dedicated 2500MW<br />
±500 kV HVDC Mundra(Gujarat)-<br />
Mohindergarh (Haryana) transmission line<br />
scheme.<br />
iii) Western Region System Strengthening<br />
Scheme-II.<br />
3.7 Cross-Border Power Exchange<br />
3.7.1 India-Bangladesh Grid<br />
connectivity<br />
In order to facilitate Cross-Border <strong>power</strong><br />
exchange between India and Bangladesh, it has<br />
been decided bilaterally to establish an electrical<br />
inter-connection between India and Bangladesh<br />
through a ±500MW HVDC asynchronous link<br />
at Bheramara (Western Part, Bangladesh) to<br />
be connected through Baharampur (India) –<br />
Bheramara (Bangladesh) 400kV D/C line along<br />
with establishment of 400kV switching-station at<br />
Baharampur (India) by looping-in and loopingout<br />
of Farakka-Jeerat 400kV Single circuit<br />
line. The project is targeted for completion<br />
within a period of 30 months from the date of<br />
award by PGCIL. The Indian portion of the<br />
line will be funded by PGCIL and the portion<br />
within Bangladesh would be funded by Govt. of<br />
Bangladesh.<br />
3.7.2 India-Bhutan Agreement<br />
The Royal Govt. of Bhutan has set the<br />
target of <strong>development</strong> of 10,000 MW by the year<br />
"Electricity is life: Conserve it."<br />
35