Central electricity authority Annual Report 2009-10<br />

e) Namrup CCGT (70 MW GT/ + /30 MW ST)<br />

Namrup 100 MW is a replacement <strong>power</strong><br />

project being executed by APGCL in Distt.<br />

Dibrugarh, Assam. EPC contract was awarded<br />

to M/s BHEL in February, 2009 with a target<br />

date of commissioning as January, 2012. Civil<br />

Works Order is yet to be placed. The project is<br />

now expected to be commissioned in 12 th Plan.<br />

11.8 Detailed Status of New Thermal<br />

Power Projects in North-eastern<br />

States<br />

Details of new <strong>thermal</strong> <strong>power</strong> projects<br />

proposed in North-eastern States is given<br />

below:<br />

i) Tripura Gas Based Power Project-<br />

104.74 MW - The project was<br />

recommended in PIB meeting held<br />

on 20.1.09. Investment Approval<br />

has been accorded vide MoP letter<br />

dated 14 th July, 2009 at a cost of<br />

Rs. 421.01 crores including IDC. The<br />

techno-commercial offer for main plant<br />

equipment has been negotiated with<br />

M/s BHEL. As the cost of the project<br />

was on the higher side when compared<br />

to the cost approved during Investment<br />

Approval, M/s NEEPCO submitted<br />

Revised Cost Estimate amounting to<br />

Rs. 623.44 crores to Ministry of Power<br />

for approval which has been discussed<br />

in the Standing Committee for<br />

determining the responsibility for time<br />

& cost overrun on the Revised Cost<br />

Estimates. The Revised Cost Estimates<br />

are yet to be approved.<br />

ii)<br />

Garo Hills Coal Based Thermal<br />

Power Project, Meghalaya, M/s<br />

NEEPCO – 500 MW - As informed<br />

by M/s NEEPCO, Govt. of Meghalaya<br />

has made the MoA non-operational in<br />

April, 2008 till further order.<br />

iii) West Khasi Hills Coal Based TPP,<br />

Meghalaya- M/s NEEPCO- 240 MW<br />

- M/s NEEPCO have informed to have<br />

submitted a draft MoA as well as JV<br />

proposal with Govt. of Meghalaya for<br />

the <strong>development</strong> of Project.<br />

(iv) Margherita Coal based TPP, Assam<br />

(JV of NEEPCO & APGCL) -250<br />

MW - M/s NEEPCO has proposed to<br />

set up Margherita TPP with an installed<br />

capacity of 250 MW in Joint Venture<br />

with APGCL. The Joint Venture<br />

Company (JVC) agreement is yet to be<br />

finalized.<br />

(v) Margherita TPP-JV of NTPC &<br />

APGCL-500 MW-As per the letter<br />

dated 20.7.09 from Hon’ble Minister,<br />

Power Public Enterprise, Industry<br />

& Commerce, Govt. of Assam, they<br />

are in discussion with M/s NTPC to<br />

implement another <strong>thermal</strong> project of<br />

500 MW capacity in eastern part of<br />

Assam in Joint Venture with Assam<br />

Power Generation Company Ltd.<br />

A team of NTPC, CEA and APGCL<br />

officials along with revenue officials visited the<br />

site on 18.9.2009 at Margherita for examining the<br />

feasibility of installing 2x250 MW units when it<br />

was observed that the site selected by APGCL is<br />

highly undulating. As per the draft report of M/s<br />

NTPC, APGCL is conducting the topographic<br />

survey of the area so as to reexamine the plant<br />

layout to minimize ground level variations and<br />

optimize leveling cost.<br />

11.9 R&M Schemes (Hydro) of Northeastern<br />

Region<br />

Nine (9) existing hydro schemes of Northeastern<br />

Region with an aggregate installed<br />

"Energy Saved is Energy Generated"<br />