Central electricity authority Annual Report 2009-10<br />

Sl<br />

No.<br />

Annexure- 5B<br />

(Item No.5.4)<br />

Hydro Capacity Addition During the year 2009-10<br />

Name of Project/<br />

State/Organisation<br />

Nos.xSize= Capacity MW<br />

Units Commissioned during 2009-10<br />

Central Sector<br />

Unit<br />

No.<br />

Capacity<br />

(MW)<br />

Target at<br />

beginning of<br />

the year<br />

Date of<br />

Rotation<br />

Date of commissioning<br />

1. Priyadarshni Jurala<br />

3 39 05/2009 26.05.09 27.06.09<br />

A.P./APGENCO (6x39)<br />

Total (Commissioned): 1 Unit 39 MW<br />

Units slipped from 2009-10<br />

Sl<br />

No.<br />

Name of Project/<br />

State/Organisation<br />

Nos. xSize = Capacity MW<br />

Central Sector<br />

1. Sewa-II<br />

J&K/NHPC<br />

(3x40 MW)<br />

2. Teesta Low Dam-III<br />

W.B./ NHPC<br />

(4x33 MW)<br />

State Sector<br />

3. Priyadarshini Jurala<br />

A.P./APGENCO<br />

6x39 = 234 MW<br />

4. Kuttiyadi Addl. Extn.<br />

Kerala/KSEB<br />

(2x50 MW)<br />

5. Myntdu (Leishka) St-I<br />

Meghalaya/MeSEB<br />

(2x42)<br />

Private Sector<br />

6. Allain Duhangan<br />

H.P./ADHPL<br />

(2x96)<br />

Unit<br />

No.<br />

1<br />

2<br />

3<br />

1<br />

2<br />

3<br />

4<br />

4<br />

5<br />

1<br />

2<br />

1<br />

2<br />

1<br />

2<br />

Capacity<br />

(MW)<br />

40<br />

40<br />

40<br />

33<br />

33<br />

33<br />

33<br />

39<br />

39<br />

50<br />

50<br />

42<br />

42<br />

96<br />

96<br />

7. Malana-II<br />

H.P./Everest P.C. (2x50)<br />

1<br />

2<br />

50<br />

50<br />

Total slippage from 2009-10 17 Units 806 MW<br />

Total -Programme: 18 Units 845 MW<br />

SUMMARY<br />

Target at<br />

beginning<br />

of the year<br />

01/2010<br />

02/2010<br />

03/2010<br />

02/2010<br />

02/2010<br />

03/2010<br />

03/2010<br />

10/2009<br />

02/2010<br />

06/2009<br />

07/2009<br />

12/2009<br />

02/2010<br />

11/2009<br />

12/2009<br />

12/2009<br />

01/2010<br />

Capacity Programmed : 845 MW<br />

Capacity Commissioned : 39 MW<br />

Capacity Slipped : 806 MW<br />

Reasons for slippage<br />

Schedule commissioning of the project got<br />

delayed because of leakage in Head Race Tunnel<br />

during filling of Water conductor system/ spinning<br />

of the machine.<br />

Commissioning during the year got delayed due<br />

to flash flood (AILA) on 26 th May, 2009 of the<br />

project area. Also, progress of works got affected<br />

due to frequent disruption of works because of<br />

the local agitation.<br />

Single shift working & Visa problem of Chinese<br />

Engineers affected the erection, testing &<br />

commissioning schedule<br />

Slow progress of erection of Penstock due to<br />

extended monsoon period and steep slope delayed<br />

the commissioning.<br />

Commissioning of the units got delayed due<br />

to flash flood on 08.10.2009 flooding the<br />

<strong>power</strong> house and affected the already installed<br />

equipment.<br />

Delay occurred in completion of Head Race<br />

Tunnel & surge shaft works due to bad geology.<br />

Power evacuation works are also delayed due to<br />

forest clearance issue.<br />

Poor geology in Head Race Tunnel has delayed<br />

the completion of works.<br />

162<br />