Central electricity authority Annual Report 2009-10<br />
Sl<br />
No.<br />
Annexure- 5B<br />
(Item No.5.4)<br />
Hydro Capacity Addition During the year 2009-10<br />
Name of Project/<br />
State/Organisation<br />
Nos.xSize= Capacity MW<br />
Units Commissioned during 2009-10<br />
Central Sector<br />
Unit<br />
No.<br />
Capacity<br />
(MW)<br />
Target at<br />
beginning of<br />
the year<br />
Date of<br />
Rotation<br />
Date of commissioning<br />
1. Priyadarshni Jurala<br />
3 39 05/2009 26.05.09 27.06.09<br />
A.P./APGENCO (6x39)<br />
Total (Commissioned): 1 Unit 39 MW<br />
Units slipped from 2009-10<br />
Sl<br />
No.<br />
Name of Project/<br />
State/Organisation<br />
Nos. xSize = Capacity MW<br />
Central Sector<br />
1. Sewa-II<br />
J&K/NHPC<br />
(3x40 MW)<br />
2. Teesta Low Dam-III<br />
W.B./ NHPC<br />
(4x33 MW)<br />
State Sector<br />
3. Priyadarshini Jurala<br />
A.P./APGENCO<br />
6x39 = 234 MW<br />
4. Kuttiyadi Addl. Extn.<br />
Kerala/KSEB<br />
(2x50 MW)<br />
5. Myntdu (Leishka) St-I<br />
Meghalaya/MeSEB<br />
(2x42)<br />
Private Sector<br />
6. Allain Duhangan<br />
H.P./ADHPL<br />
(2x96)<br />
Unit<br />
No.<br />
1<br />
2<br />
3<br />
1<br />
2<br />
3<br />
4<br />
4<br />
5<br />
1<br />
2<br />
1<br />
2<br />
1<br />
2<br />
Capacity<br />
(MW)<br />
40<br />
40<br />
40<br />
33<br />
33<br />
33<br />
33<br />
39<br />
39<br />
50<br />
50<br />
42<br />
42<br />
96<br />
96<br />
7. Malana-II<br />
H.P./Everest P.C. (2x50)<br />
1<br />
2<br />
50<br />
50<br />
Total slippage from 2009-10 17 Units 806 MW<br />
Total -Programme: 18 Units 845 MW<br />
SUMMARY<br />
Target at<br />
beginning<br />
of the year<br />
01/2010<br />
02/2010<br />
03/2010<br />
02/2010<br />
02/2010<br />
03/2010<br />
03/2010<br />
10/2009<br />
02/2010<br />
06/2009<br />
07/2009<br />
12/2009<br />
02/2010<br />
11/2009<br />
12/2009<br />
12/2009<br />
01/2010<br />
Capacity Programmed : 845 MW<br />
Capacity Commissioned : 39 MW<br />
Capacity Slipped : 806 MW<br />
Reasons for slippage<br />
Schedule commissioning of the project got<br />
delayed because of leakage in Head Race Tunnel<br />
during filling of Water conductor system/ spinning<br />
of the machine.<br />
Commissioning during the year got delayed due<br />
to flash flood (AILA) on 26 th May, 2009 of the<br />
project area. Also, progress of works got affected<br />
due to frequent disruption of works because of<br />
the local agitation.<br />
Single shift working & Visa problem of Chinese<br />
Engineers affected the erection, testing &<br />
commissioning schedule<br />
Slow progress of erection of Penstock due to<br />
extended monsoon period and steep slope delayed<br />
the commissioning.<br />
Commissioning of the units got delayed due<br />
to flash flood on 08.10.2009 flooding the<br />
<strong>power</strong> house and affected the already installed<br />
equipment.<br />
Delay occurred in completion of Head Race<br />
Tunnel & surge shaft works due to bad geology.<br />
Power evacuation works are also delayed due to<br />
forest clearance issue.<br />
Poor geology in Head Race Tunnel has delayed<br />
the completion of works.<br />
162<br />