Central electricity authority Annual Report 2009-10<br />

50000 MW H.E. INITIATIVE<br />

Annexure-11A<br />

(Item No.11.3)<br />

(1/3)<br />

Low Tariff HE Schemes under Survey & Investigation / Preparation<br />

of DPR in North-Eastern Region<br />

Sl.<br />

No.<br />

Name of<br />

Scheme<br />

State River Type Basin Agency<br />

A. Schemes for which DPRs have been prepared<br />

1.<br />

Talong<br />

(Londa)<br />

2. Badao<br />

3. Dibbin<br />

4. Demwe<br />

Arunachal<br />

Pradesh<br />

Arunachal<br />

Pradesh<br />

Arunachal<br />

Pradesh<br />

Arunachal<br />

Pradesh<br />

I.C.<br />

(MW)<br />

Original<br />

Schedule<br />

for DPR<br />

Revised<br />

Schedule<br />

for DPR<br />

Kameng STO Kameng GMR Ltd. 300 - -<br />

Kameng ROR Kameng<br />

Bichom ROR Kameng<br />

Lohit STO Lohit<br />

Coastal<br />

Projects<br />

Pvt. Ltd.<br />

KSK<br />

Electricity<br />

Financing<br />

India Ltd.<br />

Athena<br />

Energy<br />

Ventures<br />

Pvt. Ltd.<br />

120 - -<br />

100 - -<br />

3000 - -<br />

5. Mawhu Meghalaya Umiew ROR Barak NEEPCO 120 - -<br />

6. Tato-II<br />

Arunachal<br />

Pradesh<br />

Siyom ROR Siang<br />

Reliance<br />

Energy<br />

Ltd.<br />

Total 4340<br />

700 - -<br />

Status / Remarks<br />

Project was initially<br />

allotted as Talong for<br />

160 MW to NEEPCO.<br />

DPR submitted as<br />

Londa for 225 MW by<br />

M/s. GMR in Oct., ‘08<br />

which was returned to<br />

the Developer in Dec.,<br />

2008.<br />

PFR was initially<br />

prepared by NEEPCO<br />

for 60 MW. PFR by<br />

Coastal Projects Pvt. Ltd.<br />

for 70 MW submitted to<br />

state Government and<br />

likely to be cleared by<br />

February, 2010.<br />

Project allotted for<br />

IC=125 MW which has<br />

been revised to 120 MW.<br />

DPR cleared by CEA on<br />

4.12.09.<br />

Project allotted as<br />

Demwe with IC=3000<br />

MW.Being developed<br />

as two schemes namely<br />

Demwe Lower (1750<br />

MW) and Demwe<br />

Upper (1800 MW).<br />

DPR for Demwe Lower<br />

submitted in Aug,<br />

2009 and Concurrence<br />

accorded on 20.11.09.<br />

DPR is under preparation<br />

by NEEPCO for 85<br />

MW.<br />

DPR submitted in May,<br />

09 returned by CEA<br />

on 04.09.09 due to<br />

inadequate geological<br />

investigations, exploring<br />

possibility of relocation<br />

of dam site, making<br />

provision of desilting<br />

chamber & review<br />

of high cost/ tariff of<br />

project. Revised DPR<br />

likely by Mar.,2010.<br />

"CEA-Helping the Transformation of Indian Power Sector"<br />

219