27.07.2014 Views

thermal power development - Infraline

thermal power development - Infraline

thermal power development - Infraline

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Central electricity authority Annual Report 2009-10<br />

(Page 4 / 4)<br />

Sl.<br />

No.<br />

Name of<br />

Utility<br />

Name of<br />

Station<br />

Unit<br />

No.<br />

Year of<br />

Commissioning<br />

Capacity<br />

(MW)<br />

Completion<br />

Schedule (Actual<br />

/ Targeted)<br />

Present Status<br />

33. Unchahar 1 1988 210 2009-10 (Actual)<br />

34. TPS 2 1989 210<br />

Total 2 420<br />

35. Rihand Stg - I 1 1988 500 2009-10 (Actual)<br />

36. STPS 2 1989 500<br />

ON-GOING<br />

Total 2 1000<br />

Sub Total NTPC 36 9920<br />

Completed in Central Sector 38 10260<br />

1. Tanda 2 1989 110 2011-12 (Target)<br />

2. 4 1998 110 2010-11 (Target) Unit taken under s/d on<br />

22.2.2010.<br />

Total 2 220<br />

3. NCTPP, 1 1992 210 2011-12 (Target) Scope of work finalised<br />

4. Dadri 2 1992 210<br />

5. 3 1993 210<br />

6. 4 1994 210<br />

Total 4 840<br />

7. Farakka Stg-II 4 1992 500 2011-12 (Target) Scheme under<br />

finalisation<br />

8. STPS 5 1994 500<br />

Total 2 1000<br />

9. Kahalgaon 1 1992 210 2011-12 (Target) Scheme under<br />

finalisation by NTPC<br />

10. 2 1994 210<br />

11. 3 1995 210<br />

Total 3 630<br />

NTPC On - Going 11 2690<br />

TOTAL CENTRAL SECTOR (2.0) 49 12950<br />

TOTAL OF R&M (1.0+2.0) 76 18965<br />

180<br />

"CEA-Helping the Transformation of Indian Power Sector"

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!