Central electricity authority Annual Report 2009-10<br />
system study and firmed up through discussion<br />
in the meetings of the Regional Standing<br />
Committee of <strong>power</strong> system planning.<br />
3.3.2 Standing Committee Meetings held<br />
during 2009-10<br />
Northern Region<br />
• 27 th Meeting of the Standing Committee<br />
on Power System Planning of Northern<br />
Region held on 30 th May, 2009 in Nainital,<br />
Uttarakhand.<br />
• 28 th Meeting of the Standing Committee on<br />
Power System Planning of Northern Region<br />
held on 23 rd February, 2010 at NRPC, New<br />
Delhi.<br />
Southern Region<br />
• 28 th Meeting of the Standing Committee on<br />
Power System Planning of Southern Region<br />
held on 15-06-2009 at Coorg, Karnataka.<br />
• 29 th Meeting of the Standing Committee on<br />
Power System Planning of Southern Region<br />
held on 27-08-2009 at Hydeabad, Andhra<br />
Pradesh.<br />
Western Region<br />
• Special meeting of the Standing Committee<br />
on Power System Planning of Western<br />
Region held on 18-04-2009 at WRPC,<br />
Mumbai.<br />
• 29 th meeting of the Standing Committee on<br />
Power System Planning of Western Region<br />
held on 10-09-2009 at Ahmedabad.<br />
Eastern Region<br />
• Standing Committee Meeting on Power<br />
System Planning of Eastern Region was<br />
held on 14-09-2009.<br />
The issues pertaining to transmission<br />
system planning which were taken up during<br />
these meetings are given in Annexure – 3B.<br />
3.4 Examination of DPR/FR of Hydro<br />
Power Projects for processing of<br />
clearance by CEA<br />
Following is the list of DPRs/FRs of<br />
hydro <strong>power</strong> projects examined for processing<br />
of clearance from <strong>power</strong> evacuation aspects :<br />
Northern Region<br />
Himachal Pradesh<br />
i) Renuka Dam (40 MW)<br />
ii) Sainj HEP (100 MW)<br />
iii) Bajoli Holi HEP (100 MW)<br />
iv) Kutehr HEP (240 MW)<br />
Uttaranchal<br />
i) Rupsiabagar HEP (327 MW)<br />
ii) Bawala Nandprayag HEP (300 MW)<br />
Southern Region<br />
i) Polavaram HEP (12x80 MW) of APGENCO<br />
in Andhra Pradesh.<br />
ii) Gundia HEP (2x200 MW) of KPCL in<br />
Karnataka.<br />
Eastern Region<br />
i) Examined the revised project reports<br />
for addendum works in the Bihar subtransmission<br />
system-Phase-II, Part-II.<br />
ii) DPR for re-alignment of existing 66kV<br />
Tadong to Phodong S/C at Perbing along<br />
with 2x5MVA 66/11kV sub-station and<br />
11kV distribution system for supply of<br />
<strong>power</strong> to Perbing area in Sikkim.<br />
iii) FR-cum-DPR for Mangdechu HEP (4x180<br />
MW) in Bhutan by M/s NHPC Ltd.<br />
iv) FR-cum-DPR for Sankosh HEP (8x500+3x60<br />
MW) in Bhutan by M/s THDC Ltd.<br />
v) FR-cum-DPR for Punatsanghu-II HEP<br />
(6x165 MW) in Bhutan by M/s WAPCOS.<br />
vi) DPR for LILO of existing 66kV Melli -<br />
Tadong D/C at Marchak along with 2x7.5<br />
MVA 66/11kV sub-station and 11kV<br />
"CEA-Helping the Transformation of Indian Power Sector"<br />