Central electricity authority Annual Report 2009-10<br />

system study and firmed up through discussion<br />

in the meetings of the Regional Standing<br />

Committee of <strong>power</strong> system planning.<br />

3.3.2 Standing Committee Meetings held<br />

during 2009-10<br />

Northern Region<br />

• 27 th Meeting of the Standing Committee<br />

on Power System Planning of Northern<br />

Region held on 30 th May, 2009 in Nainital,<br />

Uttarakhand.<br />

• 28 th Meeting of the Standing Committee on<br />

Power System Planning of Northern Region<br />

held on 23 rd February, 2010 at NRPC, New<br />

Delhi.<br />

Southern Region<br />

• 28 th Meeting of the Standing Committee on<br />

Power System Planning of Southern Region<br />

held on 15-06-2009 at Coorg, Karnataka.<br />

• 29 th Meeting of the Standing Committee on<br />

Power System Planning of Southern Region<br />

held on 27-08-2009 at Hydeabad, Andhra<br />

Pradesh.<br />

Western Region<br />

• Special meeting of the Standing Committee<br />

on Power System Planning of Western<br />

Region held on 18-04-2009 at WRPC,<br />

Mumbai.<br />

• 29 th meeting of the Standing Committee on<br />

Power System Planning of Western Region<br />

held on 10-09-2009 at Ahmedabad.<br />

Eastern Region<br />

• Standing Committee Meeting on Power<br />

System Planning of Eastern Region was<br />

held on 14-09-2009.<br />

The issues pertaining to transmission<br />

system planning which were taken up during<br />

these meetings are given in Annexure – 3B.<br />

3.4 Examination of DPR/FR of Hydro<br />

Power Projects for processing of<br />

clearance by CEA<br />

Following is the list of DPRs/FRs of<br />

hydro <strong>power</strong> projects examined for processing<br />

of clearance from <strong>power</strong> evacuation aspects :<br />

Northern Region<br />

Himachal Pradesh<br />

i) Renuka Dam (40 MW)<br />

ii) Sainj HEP (100 MW)<br />

iii) Bajoli Holi HEP (100 MW)<br />

iv) Kutehr HEP (240 MW)<br />

Uttaranchal<br />

i) Rupsiabagar HEP (327 MW)<br />

ii) Bawala Nandprayag HEP (300 MW)<br />

Southern Region<br />

i) Polavaram HEP (12x80 MW) of APGENCO<br />

in Andhra Pradesh.<br />

ii) Gundia HEP (2x200 MW) of KPCL in<br />

Karnataka.<br />

Eastern Region<br />

i) Examined the revised project reports<br />

for addendum works in the Bihar subtransmission<br />

system-Phase-II, Part-II.<br />

ii) DPR for re-alignment of existing 66kV<br />

Tadong to Phodong S/C at Perbing along<br />

with 2x5MVA 66/11kV sub-station and<br />

11kV distribution system for supply of<br />

<strong>power</strong> to Perbing area in Sikkim.<br />

iii) FR-cum-DPR for Mangdechu HEP (4x180<br />

MW) in Bhutan by M/s NHPC Ltd.<br />

iv) FR-cum-DPR for Sankosh HEP (8x500+3x60<br />

MW) in Bhutan by M/s THDC Ltd.<br />

v) FR-cum-DPR for Punatsanghu-II HEP<br />

(6x165 MW) in Bhutan by M/s WAPCOS.<br />

vi) DPR for LILO of existing 66kV Melli -<br />

Tadong D/C at Marchak along with 2x7.5<br />

MVA 66/11kV sub-station and 11kV<br />

"CEA-Helping the Transformation of Indian Power Sector"<br />

33