27.07.2014 Views

thermal power development - Infraline

thermal power development - Infraline

thermal power development - Infraline

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Central electricity authority Annual Report 2009-10<br />

S.No. Name (S/Shri) Designation Name of the Programme Venue Duration<br />

15. S.Biswas Director (DLMF) Asia Pacific Partnership(APP)<br />

on“Clean Development and Climate”-<br />

Distribution and demand side<br />

management programme Climate”<br />

USA 27.04.2009 to<br />

02.05.2009<br />

16. Mrs. Anjuli<br />

Chandra<br />

Director (HRD)<br />

Asia Pacific Partnership(APP)<br />

on“Clean Development and Climate”-<br />

Distribution and demand side<br />

management programme Climate”<br />

17. S.Mandilwar Director (IRP) Indo-Germany Energy Programme<br />

(IGEN) for study cum familiarization<br />

tour and interchange of best practices<br />

with <strong>power</strong> plant operators under<br />

IGEN.<br />

18. P.K. Pahwa Director (SP&PA) Presentation of DPR of<br />

Punatsangchhu-II Project and review<br />

of earlier comprehensive planning<br />

transmission system with RGoB<br />

19. Moti Lal Director<br />

(HE&TD)<br />

Preparation of detailed Project Report<br />

(DPR) for Punatsangchhu HE Project<br />

Stage-II (6x165MW)<br />

20. P.C. Kureel Director (HETD) To participate in pre-bid meeting,<br />

discussions for Contract Package<br />

MEM-I including site visit for<br />

Punatsangchhu Hydro-Electric Project<br />

Stage-I<br />

21. Sanjay<br />

Srivastava<br />

Director (HETD)<br />

To participate in pre-bid meeting,<br />

discussions for Contract Package<br />

MEM-I including site visit for<br />

Punatsangchhu Hydro-Electric Project<br />

Stage-I<br />

22. Bhai Lal Director (TPM) Study tour to Power plants and<br />

manufacturing units for Energy<br />

Efficiency R&M Programme<br />

under USAID ECO-Asia Clean<br />

Development Climate Programme<br />

USA<br />

Germany,<br />

Bhutan<br />

Bhutan<br />

Bhutan<br />

Bhutan<br />

Germany,<br />

Czech and<br />

Poland<br />

27.04.2009 to<br />

02.05.2009<br />

03.05.2009 to<br />

16.05.2009<br />

08.05.2009 to<br />

13.05.2009<br />

08.05.2009 to<br />

13.05.2009<br />

18.08.2009 to<br />

23.08.2009<br />

18.08.2009 to<br />

23.08.2009<br />

23.09.2009 to<br />

01.10.2009<br />

23. R. Saha Director (SP&PA) Sankosh HE Project Bhutan 09.01.2010 to<br />

11.01.2010<br />

24. Anis Ahmad Dy. Director<br />

(TRM)<br />

25. S.Rawat Dy. Director<br />

(C&E)<br />

26. N.K. Gupta Dy.Director<br />

(HE&RM)<br />

Indo-Germany Energy Programme<br />

(IGEN) for study cum familiarization<br />

tour and interchange of best practices<br />

with <strong>power</strong> plant operators under<br />

IGEN<br />

Germany<br />

03.05.2009 to<br />

16.05.2009<br />

Visited under IGEN Programme Germany 14.06.2009 to<br />

27.06.2009<br />

Inspection of Run Out Test of turbine<br />

shaft for Myntdu (Leshka) HE Project<br />

Stage-I Extension (1x42MW)<br />

Italy<br />

03.09.2009 to<br />

04.09.2009<br />

(2/3)<br />

224<br />

"Electricity is life: Conserve it."

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!