Central electricity authority Annual Report 2009-10<br />
S.No. Name (S/Shri) Designation Name of the Programme Venue Duration<br />
15. S.Biswas Director (DLMF) Asia Pacific Partnership(APP)<br />
on“Clean Development and Climate”-<br />
Distribution and demand side<br />
management programme Climate”<br />
USA 27.04.2009 to<br />
02.05.2009<br />
16. Mrs. Anjuli<br />
Chandra<br />
Director (HRD)<br />
Asia Pacific Partnership(APP)<br />
on“Clean Development and Climate”-<br />
Distribution and demand side<br />
management programme Climate”<br />
17. S.Mandilwar Director (IRP) Indo-Germany Energy Programme<br />
(IGEN) for study cum familiarization<br />
tour and interchange of best practices<br />
with <strong>power</strong> plant operators under<br />
IGEN.<br />
18. P.K. Pahwa Director (SP&PA) Presentation of DPR of<br />
Punatsangchhu-II Project and review<br />
of earlier comprehensive planning<br />
transmission system with RGoB<br />
19. Moti Lal Director<br />
(HE&TD)<br />
Preparation of detailed Project Report<br />
(DPR) for Punatsangchhu HE Project<br />
Stage-II (6x165MW)<br />
20. P.C. Kureel Director (HETD) To participate in pre-bid meeting,<br />
discussions for Contract Package<br />
MEM-I including site visit for<br />
Punatsangchhu Hydro-Electric Project<br />
Stage-I<br />
21. Sanjay<br />
Srivastava<br />
Director (HETD)<br />
To participate in pre-bid meeting,<br />
discussions for Contract Package<br />
MEM-I including site visit for<br />
Punatsangchhu Hydro-Electric Project<br />
Stage-I<br />
22. Bhai Lal Director (TPM) Study tour to Power plants and<br />
manufacturing units for Energy<br />
Efficiency R&M Programme<br />
under USAID ECO-Asia Clean<br />
Development Climate Programme<br />
USA<br />
Germany,<br />
Bhutan<br />
Bhutan<br />
Bhutan<br />
Bhutan<br />
Germany,<br />
Czech and<br />
Poland<br />
27.04.2009 to<br />
02.05.2009<br />
03.05.2009 to<br />
16.05.2009<br />
08.05.2009 to<br />
13.05.2009<br />
08.05.2009 to<br />
13.05.2009<br />
18.08.2009 to<br />
23.08.2009<br />
18.08.2009 to<br />
23.08.2009<br />
23.09.2009 to<br />
01.10.2009<br />
23. R. Saha Director (SP&PA) Sankosh HE Project Bhutan 09.01.2010 to<br />
11.01.2010<br />
24. Anis Ahmad Dy. Director<br />
(TRM)<br />
25. S.Rawat Dy. Director<br />
(C&E)<br />
26. N.K. Gupta Dy.Director<br />
(HE&RM)<br />
Indo-Germany Energy Programme<br />
(IGEN) for study cum familiarization<br />
tour and interchange of best practices<br />
with <strong>power</strong> plant operators under<br />
IGEN<br />
Germany<br />
03.05.2009 to<br />
16.05.2009<br />
Visited under IGEN Programme Germany 14.06.2009 to<br />
27.06.2009<br />
Inspection of Run Out Test of turbine<br />
shaft for Myntdu (Leshka) HE Project<br />
Stage-I Extension (1x42MW)<br />
Italy<br />
03.09.2009 to<br />
04.09.2009<br />
(2/3)<br />
224<br />
"Electricity is life: Conserve it."