Central electricity authority Annual Report 2009-10<br />
above under the chairmanship of Chief Enginer<br />
(DP&D) CEA. The term of reference of the<br />
Committee is to standardize the parameters<br />
for kVAh metering and methodology for the<br />
Harmonic measurement and reactive <strong>power</strong><br />
measurement. The report of the Committee is<br />
under finalization.<br />
7.3 Guidelines for Specifications for<br />
Transformers<br />
• Member(GO&D), CEA took a meeting on<br />
17 th November, 2009 with <strong>power</strong> utilities<br />
to share the experience of <strong>power</strong> utilities<br />
regarding Guidelines for ‘Specification of<br />
Energy Efficient Outdoor Type Three Phase<br />
and Single Phase Distribution Transformer’<br />
issued by CEA and use of Amorphous Core<br />
Transformers.<br />
• Matter regarding revision of limits of<br />
maximum losses of various capacity of<br />
distribution transformers included in the<br />
Guidelines of CEA is under examination.<br />
7.4 Reports of Sub Group–I constituted<br />
for Grid Interactive Roof Top Solar<br />
PV System<br />
(a) A Task Force was constituted by MNRE<br />
under the chairmanship of Chairperson,<br />
CEA to examine the technical issues related<br />
to feasibility of integrating solar <strong>power</strong><br />
plants with <strong>thermal</strong>/hydro <strong>power</strong> plant and<br />
inter-connectivity of solar rooftop system<br />
with the grid. The Task Force comprised<br />
of members from CEA, Ministry of<br />
Power, Ministry of Environment & Forest,<br />
MNRE, BEE, NTPC, NHPC, BHEL,<br />
CEL, RCEL, RRVUNL and GEDA. The<br />
first meeting of the Task Force was held<br />
on 18th June, 2009 at CEA Headquarters,<br />
New Delhi. During the meeting, three<br />
sub-groups were formed to look into<br />
interconnectivity of solar rooftop system<br />
with the grid, integration of solar <strong>power</strong><br />
plant with the existing <strong>thermal</strong> <strong>power</strong><br />
plant and integration of solar <strong>power</strong> plant<br />
with the existing hydro plant. Sub Group-I<br />
was also requested to prepare a Feasibility<br />
Report for installing solar plant in Leh<br />
and Sewa Bhawan.<br />
The first meeting of the Sub Group-I was<br />
held in July, 2009 at CEA Headquarters<br />
and based on the comments/ suggestions of<br />
the Committee Members and stakeholders,<br />
the following Reports were finalized and<br />
submitted to MNRE and also uploaded on<br />
CEA website for wide use:<br />
1. Report of Sub Group-I on the Grid tied<br />
Rooftop Solar PV system<br />
2. Detailed Project Report for Grid tied<br />
Rooftop Solar PV <strong>power</strong> plant at Sewa<br />
Bhawan<br />
3. Technical Specification of Grid tied<br />
Rooftop Solar PV system for Sewa<br />
Bhawan<br />
(b) A Seminar on ‘Solar Power Generation<br />
in India and Related Technologies’ was<br />
organized in association with CBIP on 9 th<br />
Februray, 2009 at New Delhi. CEA made<br />
the presentation in this seminar.<br />
(c) A tour to Leh was undertaken to study the<br />
feasibility of setting up of SPV plant there.<br />
The Feasibility Report for setting up of SPV<br />
Power Plant at Leh has been prepared and<br />
is being submitted to MNRE and Govt. of<br />
J&K.<br />
7.5 Committee for HVDS system for<br />
Gujarat<br />
A Committee, to assess the fund<br />
requirement for agriculture demand side<br />
management on HVDS in the State of Gujarat,<br />
was constituted by MoP under the chairmanship<br />
84<br />
“CEA-Helping the Transformation of Indian Power Sector”