27.07.2014 Views

thermal power development - Infraline

thermal power development - Infraline

thermal power development - Infraline

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Central electricity authority Annual Report 2009-10<br />

INDEX<br />

S. No. Name of the Chapter Page No.<br />

Chapter-1 Organisation 1–16<br />

Chapter-2 Planning for Power Development 17–31<br />

Chapter-3 Power Systems Planning and Development 32–44<br />

Chapter-4 Grid Management 45–54<br />

Chapter-5 Hydro Power Development 55–64<br />

Chapter-6 Thermal Power Development 65–82<br />

Chapter-7 Distribution and Rural Electrification 83–90<br />

Chapter-8 Design & Engineering Services 91–95<br />

Chapter-9 Economic and Commercial Aspects of Power Industry 96–109<br />

Chapter-10 Power Generation 110–116<br />

Chapter-11 Power Development in North-Eastern Region 117–130<br />

Chapter-12 Training and Human Resource Development 131–135<br />

Annexure 2A Status of Projects under National Perspective Plan on R&D for Power 136–137<br />

Sector<br />

Annexure 2B Awardees for the year 2008-09 138–139<br />

Annexure 3A Details of Inter-Regional Transmission capacity – Existing and planned 140–141<br />

for 11 th Plan<br />

Annexure 3B Issues Pertaining To Transmission System Planning Taken Up During 142–144<br />

2009-10<br />

Annexure 3C Transmission Lines completed during the year 2009-10 145–152<br />

Annexure 3D Sub-Stations commissioned during the year 2009-10 153–156<br />

Annexure 4A Power Supply Position during 2009-10 157<br />

Annexure 4B Status of Capacitor Installation as on 31.3.2010 158<br />

Annexure 5A PFRs under 50,000 MW Hydroelectric Initiative 159–161<br />

Annexure 5B Hydro capacity addition during 2009-10 162<br />

Annexure 5C Hydro capacity addition programme for the year 2010-11 163<br />

Annexure 5D Hydro Projects identified for benefits during 12 th Plan 164–166<br />

Annexure 5E Savings Achieved in the Hard Cost while Concurring/Appraising of 167<br />

Hydro Generation Schemes by CEA during 2009-10<br />

Annexure 6A Status of Implementation of Ultra Mega Power Projects already<br />

awarded<br />

168–169<br />

v

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!