Central electricity authority Annual Report 2009-10<br />
Sl. No. Name of TPS Unit No. Capacity (MW)<br />
Central Sector<br />
1 Anta CCGT (NTPC) GT – 1 to 3 3x89<br />
State Sector<br />
2 Obra TPS 1 40<br />
3 Obra TPS 2 40<br />
4 Obra TPS 6 94<br />
5 Harduaganj TPS 5 60<br />
6 Panipat TPS 1 110<br />
7 Ukai TPS 1 120<br />
8 Ukai TPS 2 120<br />
6.11.4 R&M Programme Status during<br />
2007-08 to 2009-10 of the 11 th Plan<br />
Similarly, during the first three years of<br />
the 11 th Plan (till March 2010), R&M works<br />
have been completed in 56 units comprising 18<br />
units and 38 units in the State and Central Sector<br />
respectively as against total 76 units planned for<br />
the 11 th Plan. Sector-wise details of units where<br />
R&M works have been completed are furnished<br />
as under:<br />
Sl. No. Name of TPS Unit No. Capacity (MW)<br />
Central Sector<br />
DVC<br />
1 Durgapur TPS 3 & 4 130+ 210<br />
NTPC<br />
2 Korba STPS 1 to 6 3x200+3x500<br />
3 Vindhyachal STPS 1 to 6 6x210<br />
4 Ramagundem STPS 1 to 6 3x200+3x500<br />
5 Farakka STPS St-I 1 to 3 3x200<br />
6 Tanda TPS 1 & 3 2x110<br />
7 Talcher TPS * 5 & 6 2x110<br />
8 Singrauli STPS 1 to 7 5x200+2x500<br />
9 Unchahar TPS St–1 1 & 2 2x210<br />
10 Rihand St–1 1 & 2 2x500<br />
State Sector<br />
11 Ropar TPS 1 to 6 6x210<br />
12 Koradi TPS 5 to 7 1x200+2x210<br />
13 Chandrapur TPS 1 to 6 4x210+2x500<br />
14 Parli TPS 3 to 5 3x210<br />
* In addition, R&M completed in Talcher TPS Unit – 1 to 4 (4x60 MW) which were not originally envisaged for R&M<br />
works in National Perspective Plan by NTPC.<br />
"Energy Saved is Energy Generated"<br />
73