Central electricity authority Annual Report 2009-10<br />
S.<br />
No<br />
Project<br />
10. Polavaram<br />
HEP<br />
State/<br />
Executing<br />
Agency<br />
Andhra<br />
Pradesh<br />
Capacity<br />
(MW)<br />
12x80<br />
11. Tato-II HEP Arunachal 4x175<br />
Pradesh<br />
12. Bowala Nand Uttarakhand 4x75<br />
Prayag HEP<br />
13. Sankosh HEP Bhutan 8x500 +<br />
3x20<br />
14. Umerhut Pump U.P.<br />
Scheme<br />
15. Kutchar HEP H.P. 3x80<br />
16. Teesta (St. IV) Sikkim 4x130<br />
HEP<br />
17. Panan HEP Sikkim 4x70<br />
18. Sainj HEP H.P. 2x50<br />
19. Bajoli Holi H.P. 3x60<br />
HEP<br />
20. Kolodyne HEP Mizoram 4x115<br />
21. Gongri HEP Arunachal 3x30<br />
Pradesh<br />
22. Lethang HEP Sikkim 3x32<br />
8.4 Preparation of DPRs of new HE<br />
Projects<br />
The Chapters for Electro-Mechanical<br />
Equipment alongwith related drawings and bill<br />
of material for the following H.E. Projects were<br />
prepared under consultancy assignment:-<br />
S.<br />
No.<br />
Project<br />
State/ Executing<br />
Agency<br />
Capacity<br />
(MW)<br />
1. Punatsangchu– II Bhutan 6x165<br />
2. Seli HE Project Himachal<br />
Pradesh<br />
3. Raoli H. E.<br />
Project<br />
4. Umngot H.E.<br />
Project<br />
Himachal<br />
Pradesh<br />
Meghalaya<br />
4x80<br />
4x105<br />
3x80<br />
8.4.1 Scrutiny of proposals for Foreign<br />
Assistance/Bilateral Co-operation<br />
for HE Projects.<br />
Various proposals regarding the foreign<br />
assistance/bi-lateral co-operation pertaining to<br />
HE Projects as received from Ministry of Power<br />
were examined and commented upon.<br />
8.5 Scrutiny of Innovative Proposals/<br />
Schemes for Hydro Power<br />
Generation<br />
The following innovative proposals as<br />
received from time to time were examined from<br />
feasibility point of view and commented upon:<br />
i. Generation of Electricity from sea waves<br />
and river water from Shri G.Chandran<br />
Palakkan.<br />
ii.<br />
Innovative idea regarding prevention of<br />
the floods in Andhra Pradesh from Shri<br />
J.P.Narayan.<br />
iii. Renovation & upgradation of all old hydro<br />
<strong>power</strong> stations to increase their capacities<br />
by replacing the old insulation with epoxy<br />
insulation and increasing the insulating<br />
properties by mixing the Nano composite<br />
fillers in the epoxy from Sri Satyamorthy,<br />
S.E(Retd.), KSEB.<br />
8.6 Other Miscellaneous Works<br />
i. Scrutiny of the Chapter on “Small Hydro<br />
Power Definitions and Glossary of Terms”<br />
of Standards/ Manuals/ Guidelines for<br />
Small Hydro Power Development” being<br />
prepared by Alternate Hydro Energy Centre,<br />
IIT, Roorkee.<br />
ii.<br />
Scrutiny of draft manuals for “Prevention<br />
against Flooding of Hydro Power Stations”<br />
being prepared by CBIP.<br />
iii. Examination of technical issues related to<br />
integration of Solar Power Plant with existing<br />
“CEA-Helping the Transformation of Indian Power Sector”<br />
93