Central electricity authority Annual Report 2009-10<br />

Mawhu (90 MW), Demwe Lower (1750 MW)<br />

and Tato-II (700 MW) have already been<br />

prepared. The status of preparation of DPRs<br />

for H.E. projects in North Eastern Region is<br />

given at Annexure-11A.<br />

11.4 Mega Hydro Electric Projects<br />

planned in North-eastern Region<br />

The Region presents very attractive sites<br />

for providing large storage with multi-purpose<br />

aspects of <strong>development</strong>. Major <strong>development</strong>s<br />

are under various stages in Siang, Subansiri<br />

and Dibang basins in Arunachal Pradesh and<br />

Tipaimukh (1500 MW) in Manipur.<br />

11.4.1 Siang Basin Projects – Arunachal<br />

Pradesh<br />

Due to large scale submergence and<br />

displacement of population involved in the<br />

original project proposal, 4 kms. upstream of<br />

Rotung village in Arunachal Pradesh, the project<br />

was modified into three separate schemes<br />

envisaging a total capacity of about 13,600 MW<br />

in three <strong>power</strong> houses. Brief details of these three<br />

schemes are as under:<br />

S.<br />

No.<br />

Name of the scheme<br />

1. Siang Upper/<br />

Intermediate H.E<br />

Project<br />

Upstream of<br />

Yingkiong near<br />

Pugging village on<br />

Siang River<br />

2. Siang Middle H.E.<br />

Project 15 kms.<br />

upstream of Raying<br />

near Roing village<br />

on the Siyom River<br />

which is a tributary<br />

of Siyom River<br />

3. Siang Lower H.E.<br />

Project<br />

Upstream of Pasighat<br />

near Routung village<br />

Location<br />

(Distt./<br />

Village)<br />

East Siang/<br />

Pugging<br />

West Siang/<br />

Roing<br />

Near<br />

Pasighat/<br />

Routung<br />

Capacity<br />

(MW)<br />

Present Status<br />

11,000 Feasibility Report (FR) prepared by NTPC for Siang<br />

Upper Stage-I (6000 MW) and Stage-II (3750 MW)<br />

avoiding submergence of important towns. State is<br />

yet to allot the project for implementation.<br />

1,000 DPR of the project was earlier prepared and submitted<br />

by NHPC in September, 2003 and returned by CEA in<br />

September, 2003. Environmental clearance accorded<br />

by MoEF on 11.02.05. Subsequently, State Govt.<br />

allocated the project for execution on BOOT basis<br />

and an agreement in this regard has been signed on<br />

22.02.06 between Reliance Energy Ltd. & Govt. of<br />

Arunachal Pradesh. DPR likely during 2010-11.<br />

2,700 The project was earlier allocated by Govt. of<br />

Arunanchal Pradesh to NHPC and Commercial<br />

viability of the project to NHPC was accorded by<br />

CEA on 25.03.2004.<br />

The State Govt. later on allocated the project to JP<br />

Associate Ltd. (JAL) for project <strong>development</strong> on<br />

BOOT basis and MoA was signed on 22.02.2006<br />

between JAL and Govt. of Arunanchal Pradesh.<br />

Further in pursuance to Tripartite Agreement signed on<br />

13.12.2007, all aspects of obligation were transferred<br />

to Jaiprakash Power Ventures Ltd. Subsequently, to<br />

incorporate an SPV for implementation of Lower<br />

Siang HEP, M/s Jaypee Arunachal Power Limited<br />

(JAPL) was formed to which Govt. of Arunanchal<br />

Pradesh accorded its consent.<br />

118<br />