Central electricity authority Annual Report 2009-10<br />

Annexure – 6H<br />

(Item No.6.12.3)<br />

R&M targets during remaining period of the 11 th Plan<br />

(2010-11 & 2011-12)<br />

State Sector<br />

A. 2010-2011 – Target (4 nos. of Units)<br />

1. Patratu TPS Unit 9&10 (2x110 MW)<br />

2. Rajghat TPS Unit 1&2 (2x67.5 MW)<br />

Sub total: 4 – units (355 MW)<br />

B. 2011-2012 – Target (5 nos. of Units)<br />

1 Anpara TPS - Unit 4&5 (2x500 MW)<br />

2 Obra TPS - Unit 7&8 (2x100 MW)<br />

3 Durgapur Projects Ltd. Unit 6 (110 MW)<br />

Sub total: 5 – units (1310 MW)<br />

Total State Sector: 9-units (1665 MW)<br />

Central Sector<br />

A. 2010-2011 – Target (1 no. Unit under NTPC)<br />

1. Tanda TPS Unit- 4 (110 MW)<br />

B. 2011-2012 – Target (10 nos. of Units under NTPC)<br />

1. Tanda TPS Unit 2 (110 MW)<br />

2. Farakka Stage-II Unit 4&5 (2x500 MW)<br />

3. NCTPP Dadri Unit 1 to 4 (4x210 MW)<br />

4. Kahalgaon STPS Unit 1 to 3 (3x210 MW)<br />

Total Central Sector: 11-units (2690 MW)<br />

Total State Sector + Central Sector : 20 units (4355 MW)<br />

182<br />