27.07.2014 Views

thermal power development - Infraline

thermal power development - Infraline

thermal power development - Infraline

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Central electricity authority Annual Report 2009-10<br />

ANNEXURE-6B<br />

(Item No.6.3)<br />

Projects based on Tariff Based Competitive Bidding<br />

(Case-II) by States<br />

S.No. Name of the Project Location Capacity (MW) Remarks<br />

Haryana<br />

1. Jhajjar District Jhajjar 2x660 Already awarded and the project is<br />

under construction<br />

Punjab<br />

2. Talwandi Saboo District Mansa 3x660 Already awarded and the project is<br />

under construction<br />

3. Rajpura Rajpura District 2x660 Already awarded<br />

Patiala<br />

4. Gidderbaha (Ghagga) Distt. Muktsar 4x660 Coal linkage is yet to be tied up<br />

Thermal Power Project –<br />

Stage-I & II, PSEB, Punjab<br />

Rajasthan<br />

5. Banswara TPP Distt. Banswara 2x660 Coal linkage is yet to be tied up<br />

Madhya Pradesh<br />

6. Shahpura District Jabalpur 2x660 Coal linkage is yet to be tied up<br />

Uttar Pradesh<br />

7. Bara Distt. Allahabad 3x660 Already awarded and the project is<br />

under construction<br />

8. Karchanna Distt. Allahabad 2x660 Already awarded<br />

9. Jawaharpur TPP Distt. Etah 2x660 Coal linkage is yet to be tied up<br />

10. Dopaha TPP Distt. Sonebhadra 3x660 Coal linkage is yet to be tied up<br />

11. Lalitpur TPP Distt. Lalitpur 3x660 Coal linkage is yet to be tied up<br />

12. Yammuna Expressway Distt. Bulandsahar 3x660 Coal linkage is yet to be tied up<br />

Chhattisgarh<br />

13. Bhaiyathan District Surguja 2x660 Already awarded<br />

Maharashtra<br />

14. Aurangabad TPP Distt. Aurangabad 2x800 Project yet to be awarded<br />

Karnataka<br />

15. Gulbarga TPP Distt. Gulbarga 2x660 Coal linkage is yet to be tied up<br />

16. Ghatprabha Distt. Belgaum 2x660 Coal linkage is yet to be tied up<br />

Bihar<br />

17. Thermal Power Project at Distt. Lakhisarai 2x660=1320 Coal linkage is yet to be tied up<br />

Kajra, (Instead of Katihar<br />

Project Site)<br />

18. Thermal Power Project Distt. Buxar 2x660=1320 Coal linkage is yet to be tied up<br />

at Chausa, (Instead of<br />

Navinagar Project Site)<br />

19. Thermal Power Project at<br />

Pirpainti,<br />

Distt. Bhagalpur 2x660=1320 Coal linkage is yet to be tied up<br />

Total 29,980<br />

170<br />

"Electricity is life: Conserve it."

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!