Central electricity authority Annual Report 2009-10<br />
S.<br />
No.<br />
Name of the scheme<br />
Location<br />
(Distt./<br />
Village)<br />
Capacity<br />
(MW)<br />
Present Status<br />
DPR submitted by M/s JPVL was for an installed<br />
capacity of 2,400 MW. After series of meetings/<br />
discussions, value additions were made by CEA/<br />
CWC, changes in layout were suggested due to<br />
which, it has been possible to accommodate one<br />
more generating unit of 300 MW thus increasing<br />
installed capacity of project from 2,400 MW to<br />
2,700 MW and increasing design energy from 12,478<br />
GWh to 13,237 GWh.<br />
Concurrence of CEA to Siang Lower HE project<br />
for installed capacity of 2,700 MW was accorded on<br />
15.2.2010.<br />
11.4.2 Subansiri Basin Projects –<br />
Arunachal Pradesh<br />
The originally identified project envisaged<br />
installed capacity of 4,800 MW. Subsequently,<br />
Govt. of Arunachal Pradesh accorded approval<br />
for <strong>development</strong> of three separate projects in<br />
place of earlier single project proposal in order<br />
to avoid submergence of Daporijo town and also<br />
to reduce displacement of people and to have<br />
minimal impact on the environment. The three<br />
separate schemes envisage total capacity of<br />
5,600 MW and are as under:<br />
S.<br />
No.<br />
Name of Scheme<br />
1. Subansiri Lower H.E. Project<br />
Gerukamukh village near original<br />
site on Subansiri River<br />
2. Subansiri Middle H.E. Project<br />
Upstream of Tamen village on<br />
Kamla river which is tributary of<br />
Subansiri river<br />
3. Subansiri Upper H.E. Project.<br />
Upstream of Daporijo near Mengal<br />
village on Subansiri River<br />
Location<br />
(District/<br />
Village)<br />
Lower Subansiri<br />
/ Gerukamukh<br />
Lower<br />
Subansiri/<br />
Tamen<br />
Upper Subansiri/<br />
Menga<br />
Capacity<br />
(MW)<br />
Present status<br />
2,000 The project has been approved<br />
by CCEA on 09.09.2003 & is<br />
under construction by NHPC.<br />
The project is likely to be<br />
commissioned during 2012-14.<br />
1,600 Project allotted to M/s Jindal<br />
Power Ltd. DPR likely by April,<br />
2012.<br />
2,000 The project is allotted to<br />
M/s KSK.<br />
11.4.3 Tipaimukh Dam Project (6x250<br />
= 1500 MW) – Manipur<br />
Tipaimukh H. E. Project is a multipurpose<br />
project involving hydro <strong>power</strong> generation, flood<br />
control and irrigation. The scheme envisages<br />
construction of a dam across river Barak<br />
immediately downstream of the confluence of the<br />
Tuivai River. The scheme envisages an installed<br />
capacity of 1,500 MW (6x250 MW). The project<br />
was entrusted to M/s NEEPCO for execution.<br />
However, lately MoP vide its letter dated 06.07.09<br />
communicated that the implementation of the<br />
project would be done through a Joint Venture<br />
"Electricity is life: Conserve it."<br />
119