Central electricity authority Annual Report 2009-10<br />

S.<br />

No.<br />

Name of the scheme<br />

Location<br />

(Distt./<br />

Village)<br />

Capacity<br />

(MW)<br />

Present Status<br />

DPR submitted by M/s JPVL was for an installed<br />

capacity of 2,400 MW. After series of meetings/<br />

discussions, value additions were made by CEA/<br />

CWC, changes in layout were suggested due to<br />

which, it has been possible to accommodate one<br />

more generating unit of 300 MW thus increasing<br />

installed capacity of project from 2,400 MW to<br />

2,700 MW and increasing design energy from 12,478<br />

GWh to 13,237 GWh.<br />

Concurrence of CEA to Siang Lower HE project<br />

for installed capacity of 2,700 MW was accorded on<br />

15.2.2010.<br />

11.4.2 Subansiri Basin Projects –<br />

Arunachal Pradesh<br />

The originally identified project envisaged<br />

installed capacity of 4,800 MW. Subsequently,<br />

Govt. of Arunachal Pradesh accorded approval<br />

for <strong>development</strong> of three separate projects in<br />

place of earlier single project proposal in order<br />

to avoid submergence of Daporijo town and also<br />

to reduce displacement of people and to have<br />

minimal impact on the environment. The three<br />

separate schemes envisage total capacity of<br />

5,600 MW and are as under:<br />

S.<br />

No.<br />

Name of Scheme<br />

1. Subansiri Lower H.E. Project<br />

Gerukamukh village near original<br />

site on Subansiri River<br />

2. Subansiri Middle H.E. Project<br />

Upstream of Tamen village on<br />

Kamla river which is tributary of<br />

Subansiri river<br />

3. Subansiri Upper H.E. Project.<br />

Upstream of Daporijo near Mengal<br />

village on Subansiri River<br />

Location<br />

(District/<br />

Village)<br />

Lower Subansiri<br />

/ Gerukamukh<br />

Lower<br />

Subansiri/<br />

Tamen<br />

Upper Subansiri/<br />

Menga<br />

Capacity<br />

(MW)<br />

Present status<br />

2,000 The project has been approved<br />

by CCEA on 09.09.2003 & is<br />

under construction by NHPC.<br />

The project is likely to be<br />

commissioned during 2012-14.<br />

1,600 Project allotted to M/s Jindal<br />

Power Ltd. DPR likely by April,<br />

2012.<br />

2,000 The project is allotted to<br />

M/s KSK.<br />

11.4.3 Tipaimukh Dam Project (6x250<br />

= 1500 MW) – Manipur<br />

Tipaimukh H. E. Project is a multipurpose<br />

project involving hydro <strong>power</strong> generation, flood<br />

control and irrigation. The scheme envisages<br />

construction of a dam across river Barak<br />

immediately downstream of the confluence of the<br />

Tuivai River. The scheme envisages an installed<br />

capacity of 1,500 MW (6x250 MW). The project<br />

was entrusted to M/s NEEPCO for execution.<br />

However, lately MoP vide its letter dated 06.07.09<br />

communicated that the implementation of the<br />

project would be done through a Joint Venture<br />

"Electricity is life: Conserve it."<br />

119