Central electricity authority Annual Report 2009-10<br />
Annexure – 6G<br />
(Item No.6.12.3)<br />
LE targets during remaining period of the 11 th Plan<br />
(2010-11 & 2011-12)<br />
State Sector<br />
A.<br />
2010 – 2011 – Target (4 nos. of Units)<br />
1.<br />
2.<br />
3.<br />
Obra TPS – 2 Unit (2x200 MW)<br />
Bhatinda TPS – 1 Unit (110 MW)<br />
Amarkantak Ext. TPS – Unit 1 & 2 (2x120 MW)<br />
Sub total : 5-units (750 MW)<br />
B. 2011 – 2012 – Target (14 nos. of Units)<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
6.<br />
7.<br />
8.<br />
Central Sector<br />
A.<br />
Total State Sector:<br />
Obra TPS – 3 Units (3x200 MW)<br />
Harduaganj TPS - Unit 7 (110 MW)<br />
Parichha TPS - Unit 1&2 (2x110 MW)<br />
Bhatinda TPS – Unit 3 (110 MW)<br />
Gandhinagar TPS - Unit 1&2 (2x120 MW)<br />
Barauni TPS - Unit 6&7 (2x110 MW)<br />
Muzaffarpur TPS - Unit 1 &2 (2x110 MW)<br />
Bandel TPS - Unit 5 (210 MW)<br />
Sub total : 14 units (1930 MW)<br />
2010 – 2011 – Target<br />
Nil<br />
19-units (2680 MW)<br />
B. 2011 – 2012 – Target (17 nos. of Units)<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
6.<br />
7.<br />
8.<br />
Badarpur TPS - unit 4&5 (2x210 MW)<br />
Singrauli STPS Unit 1&2 (2x200 MW)<br />
Korba STPS Unit 1 (200 MW)<br />
Ramagundem STPS Unit1 (200 MW)<br />
Dadri CCGT GT Unit 1 to 3 (3x131 MW)<br />
Auraiya CCGT GT Unit 1 to 3 (3x111.19 MW)<br />
Kawas CCGT GT Unit 1 to 3 (3x106 MW)<br />
Gandhar CCGT GT Unit 1&2 (2x131 MW)<br />
Sub total : 17 units (2526 MW)<br />
Total State Sector + Central Sector : 36 units (5206 MW)<br />