Central electricity authority Annual Report 2009-10<br />
of CE (DPD), CEA having members from PFC<br />
and REC. The report of the Committee is under<br />
finalization.<br />
7.6 Preparation of Monthly Progress<br />
Report for Reliability Index<br />
CEA is collecting information in respect<br />
of number and duration of outages of <strong>power</strong><br />
supply to consumer and reliability index besides<br />
the outages of 11 kV feeders in respect of<br />
State capitals & major towns with population<br />
of more than eight lakhs as well as other towns<br />
having population of more than one lakh. This<br />
information is being made available to CEA<br />
every month by various distribution companies<br />
where GIS system has been completed.<br />
7.7 Works related to Union Territories<br />
(UTs)<br />
CEA rendered technical assistance to<br />
the UTs viz Andaman & Nicobar Islands,<br />
Lakshadweep Islands, Dadra & Nagar Haveli,<br />
Daman & Diu, Pondicherry, Chandigarh and Delhi<br />
including NDMC in project/ DPR formulation,<br />
technical clearance of Generation, Transmission<br />
& Distribution Schemes of UTs, preparation<br />
of Technical Specification for procurement<br />
of equipment, vetting of NITs/ acceptance of<br />
tenders, advise to UT Administration on specific<br />
technical, organizational and staff matters etc.<br />
as and when referred to. CEA also renders<br />
technical advise to DONER and NCRPB as &<br />
when requested.<br />
The following main works were completed<br />
in respect of Union Territories (UTs):<br />
7.7.1 Andaman & Nicobar (A&N)<br />
Islands<br />
1. The scheme for augmentation of DG<br />
capacity and T&D system at Havelock<br />
Islands during 11 th Plan period was accorded<br />
technical clearance.<br />
2. Draft EFC Memo in respect of RCE for<br />
DPR of Restoration /Revival of damaged<br />
<strong>power</strong> supply infrastructure in various<br />
islands / areas in Andaman & Nicobar<br />
Island affected by earthquake & tsunami on<br />
26.12.2004 was vetted and comments sent<br />
to MoP/ UT Administration.<br />
3. CEA officers attended various meetings<br />
of the Standing Committee for Time and<br />
Cost Overrun in respect of RCE for DPR<br />
of Restoration/Revival of Power Sector<br />
in various Islands of UT of Andaman &<br />
Nicobar Islands affected by earthquake &<br />
tsunami chaired by Addl. Secretary, MoP.<br />
4. CEA officers attended EFC meeting taken<br />
by Secretary(Finance), GoI to consider the<br />
RCE for the scheme of Restoration/Revival<br />
of the Power Sector in the various Islands of<br />
UT of A&N Islands affected by earthquake<br />
and tsunami on 26.12.04 at an estimated<br />
cost of Rs. 297.53 Crores.<br />
5. Scheme for establishment of new DG<br />
Power House of 1x1000 kVA capacity at<br />
Mayabander was examined.<br />
7.7.2 Lakshadweep<br />
Technical Specifications for RMUs,<br />
distribution transformers and other equipments<br />
for augmentation of distribution system at various<br />
islands of UT of Lakshdweep were examined.<br />
7.7.3 Dadra & Nagar Haveli (D&NH)<br />
1. The schemes for establishment of new<br />
66/11 kV, 2x15 MVA S/S at Kala,<br />
augmentation of S/C 66 kV transmission line<br />
to Double Circuit line from Kharadpada to<br />
Dadra and 66 kV <strong>power</strong> supply arrangement<br />
to M/s JBF Industries Ltd. from Rakholi S/S<br />
were accorded technical clearance.<br />
2 Schemes for establishment of 66/11 kV S/Ss<br />
at Piperia, Velugam and Sailly and Revised<br />
“Energy Saved is Energy Generated”<br />
85